$@MID@$: 243
Date: Thu, 28 Mar 2019 10:34:41 +0000
Author: Drive Team- Ino&Thierry&Armand + Juli (IFAE)
Type: Telescope Operations
Category:
Subject: High speed drive tests
Attachment:
Encoding: HTML
========================================
new session of high speed drive tests after issues with Power Supply.
- Tests of emergency stop (with a speed at 25% and 43 % GRB speed) with a modification of the jerk value from 0.08 to 0.2 ==> OK
- Tests of azimuth movements : (-90 to 270 degres)
- at 60% of GRB speed. ==> Ok for 6 movements
- at 80% of GRB speed
- Ok for 4 movements
- Failures due to resistance (sur-tension). Breaking modules in failure then reset
- Ok for 2 next movements
- at 100% of GRB speed :
- 3 movements from -90 to 90 ==> OK
- Temperature of breaking resistance are getting very high (at least the top one)