Main Logbooks page LST commissioning Shift checklists Safe state checklists Maintenance activities LST2-4 Commissioning Old logbooks
GENERAL CAMERA DRIVE ENERGY AMC
  LST1 Drive ELOG  ELOG logo
Message ID: 247     Entry time: Tue Apr 16 14:34:22 2019
Author: Drive Team- Ino 
Type: Telescope Operations 
Category: Hardware 
Subject: Cabling the azimuth end switches 
Status:  
  • Cabling the azimuth end switches.
ELOG V3.1.5-fc6679b