Difference between revisions of "Hardware Stereo Trigger paper"

From my_wiki
Jump to: navigation, search
(People involved)
 
(One intermediate revision by one other user not shown)
Line 16: Line 16:
 
* Luis Angel Tejedor
 
* Luis Angel Tejedor
 
* Juan Abel Barrio
 
* Juan Abel Barrio
* Daniel Mazin  
+
* Daniel Mazin
 +
* Carlos Delgado
 +
* Alice Donini
 +
* Riccardo Paoletti
  
 
== Index and contents ==
 
== Index and contents ==

Latest revision as of 13:46, 17 May 2024

Back to Main page
Back to Camera paper page

Outline of the project[edit]

  • Purpose: Evaluation of the LST Hardware Stereo Trigger system implementation and performance, based on LST1, MAGIC-I and MAGIC-II telescopes
  • Expected dates: Draft written by July 2024
  • Constraints: Paper required for Alejandro Pérez's and Joshua Baxter's PhD theses

People involved[edit]

  • Alejandro Pérez
  • Joshua Baxter
  • Luis Angel Tejedor
  • Juan Abel Barrio
  • Daniel Mazin
  • Carlos Delgado
  • Alice Donini
  • Riccardo Paoletti

Index and contents[edit]

  • Introduction
  • LST Hardware Stereo Trigger Concept
  • Test set-up
- Laboratory set-up
- LST1-MAGIC set-up
  • Firmware description
  • System Performance
  • Conclusion

List of contents[edit]

Data available[edit]

Data analysis[edit]

Main Results[edit]