Difference between revisions of "Commissioning Shift P3"
MartinWill (talk | contribs) (Created page with "* Commissioning Shift Period: 3 * Dates: 17.2.2019 - 3.3.2019 * Commissioning Shift Leader: Martin Will * Commissioning Shifters: ** Drive: Inocencio, Thierry (23/02-) ** Came...") |
MartinWill (talk | contribs) |
||
Line 2: | Line 2: | ||
* Dates: 17.2.2019 - 3.3.2019 | * Dates: 17.2.2019 - 3.3.2019 | ||
* Commissioning Shift Leader: Martin Will | * Commissioning Shift Leader: Martin Will | ||
− | * Commissioning Shifters: | + | * Commissioning Shifters / Experts: |
− | ** Drive: Inocencio, Thierry ( | + | ** Drive: Inocencio (from 25/02), Thierry (from 25/02) |
− | ** Camera: Lea, Shunsuke, Seiya, Tomohiko, Oscar, Gustavo | + | ** Camera: Lea (until 23/02), Shunsuke, Seiya, Tomohiko (until 02/03), Oscar (from 25/02), Gustavo (25/02 -- 01/03) |
− | ** AMC / Mirrors: Satoshi, Tomohiro | + | ** AMC / Mirrors: Satoshi (until 02/03), Tomohiro |
+ | ** Other: Daniel Mazin (from 1.3.) | ||
Back to [[Logbook_Commissioning|Commissioning Logbooks]]. | Back to [[Logbook_Commissioning|Commissioning Logbooks]]. |
Latest revision as of 19:40, 25 February 2019
- Commissioning Shift Period: 3
- Dates: 17.2.2019 - 3.3.2019
- Commissioning Shift Leader: Martin Will
- Commissioning Shifters / Experts:
- Drive: Inocencio (from 25/02), Thierry (from 25/02)
- Camera: Lea (until 23/02), Shunsuke, Seiya, Tomohiko (until 02/03), Oscar (from 25/02), Gustavo (25/02 -- 01/03)
- AMC / Mirrors: Satoshi (until 02/03), Tomohiro
- Other: Daniel Mazin (from 1.3.)
Back to Commissioning Logbooks.
Commissioning Leader Diary[edit]
Daily List of Tests and Installations[edit]
Date | Category / System | Activities | Documents / Pictures |
---|---|---|---|
2019-02-17 Sunday |
Drive | ||
Camera | |||
AUX | |||
Other | Day off. Check of conditions at site. P1 CL Riccardo R. arrived on site, no overlap with previous CL (since there was none). | ||