Difference between revisions of "Commissioning Shift P3"

From my_wiki
Jump to: navigation, search
(Created page with "* Commissioning Shift Period: 3 * Dates: 17.2.2019 - 3.3.2019 * Commissioning Shift Leader: Martin Will * Commissioning Shifters: ** Drive: Inocencio, Thierry (23/02-) ** Came...")
 
 
Line 2: Line 2:
 
* Dates: 17.2.2019 - 3.3.2019
 
* Dates: 17.2.2019 - 3.3.2019
 
* Commissioning Shift Leader: Martin Will
 
* Commissioning Shift Leader: Martin Will
* Commissioning Shifters:
+
* Commissioning Shifters / Experts:
** Drive: Inocencio, Thierry (23/02-)
+
** Drive: Inocencio (from 25/02), Thierry (from 25/02)
** Camera: Lea, Shunsuke, Seiya, Tomohiko, Oscar, Gustavo
+
** Camera: Lea (until 23/02), Shunsuke, Seiya, Tomohiko (until 02/03), Oscar (from 25/02), Gustavo (25/02 -- 01/03)
** AMC / Mirrors: Satoshi, Tomohiro
+
** AMC / Mirrors: Satoshi (until 02/03), Tomohiro
 +
** Other: Daniel Mazin (from 1.3.)
  
 
Back to [[Logbook_Commissioning|Commissioning Logbooks]].
 
Back to [[Logbook_Commissioning|Commissioning Logbooks]].

Latest revision as of 19:40, 25 February 2019

  • Commissioning Shift Period: 3
  • Dates: 17.2.2019 - 3.3.2019
  • Commissioning Shift Leader: Martin Will
  • Commissioning Shifters / Experts:
    • Drive: Inocencio (from 25/02), Thierry (from 25/02)
    • Camera: Lea (until 23/02), Shunsuke, Seiya, Tomohiko (until 02/03), Oscar (from 25/02), Gustavo (25/02 -- 01/03)
    • AMC / Mirrors: Satoshi (until 02/03), Tomohiro
    • Other: Daniel Mazin (from 1.3.)

Back to Commissioning Logbooks.

Commissioning Leader Diary[edit]

Commissioning_Leader_Diary_P3

Daily List of Tests and Installations[edit]

Date Category / System Activities Documents / Pictures
2019-02-17
Sunday
Drive
Camera
AUX
Other Day off. Check of conditions at site. P1 CL Riccardo R. arrived on site, no overlap with previous CL (since there was none).