Difference between revisions of "Commissioning Shift P12"
DirkHoffmann (talk | contribs) (→June 23rd) |
DirkHoffmann (talk | contribs) (→June 25th) |
||
Line 25: | Line 25: | ||
= June 25th = | = June 25th = | ||
+ | |||
+ | Investigations on [[LidarEvents|LIDAR events]] observed in run #591. | ||
+ | |||
+ | [[File:CableShadowing DSC 7170.jpg|thumb|left]] | ||
+ | [[File:CableShadowing DSC 7171.jpg|thumb|left]] | ||
+ | [[File:CableShadowing DSC 7172.jpg|thumb|left]] | ||
= June 26th = | = June 26th = |
Revision as of 22:45, 25 June 2019
Contents
P12 (21.6.2019 - 8.7.2019)
- Commissioning Shift Period: 12
- Dates: 24.5.2019 - 10.6.2019
- Commissioning Shift Leader: Dirk Hoffmann
- Commissioning Shifters / Experts:
- Drive: Thierry Le Flour, Ino Monteiro
- Camera: Takayuki Saito, Shunsuke Saturai, Yokiho Kobayashi
- AMC / Mirrors: Koji Noda (until 21.6.)
Other:
Summary Tests and Installations
E-log starting on June 23rd is here.
June 23rd
Taking data for camera timing calibration, using CaliBox pulses.
Pictures of sunspots and more studies taken by José Miguel and Koji Noda. My contributions.
June 24th
June 25th
Investigations on LIDAR events observed in run #591.