Difference between revisions of "Commissioning Shift P12"

From my_wiki
Jump to: navigation, search
(June 25th)
(June 25th: remove erroneously deposited images)
Line 27: Line 27:
  
 
Investigations on [[LidarEvents|LIDAR events]] observed in run #591.
 
Investigations on [[LidarEvents|LIDAR events]] observed in run #591.
 
[[File:CableShadowing DSC 7170.jpg|thumb|left]]
 
[[File:CableShadowing DSC 7171.jpg|thumb|left]]
 
[[File:CableShadowing DSC 7172.jpg|thumb|left]]
 
  
 
= June 26th =
 
= June 26th =

Revision as of 22:46, 25 June 2019

P12 (21.6.2019 - 8.7.2019)

  • Commissioning Shift Period: 12
  • Dates: 24.5.2019 - 10.6.2019
  • Commissioning Shift Leader: Dirk Hoffmann
  • Commissioning Shifters / Experts:
    • Drive: Thierry Le Flour, Ino Monteiro
    • Camera: Takayuki Saito, Shunsuke Saturai, Yokiho Kobayashi
    • AMC / Mirrors: Koji Noda (until 21.6.)

Other:

Summary Tests and Installations

E-log starting on June 23rd is here.

June 23rd

Taking data for camera timing calibration, using CaliBox pulses.

Pictures of sunspots and more studies taken by José Miguel and Koji Noda. My contributions.

June 24th

June 25th

Investigations on LIDAR events observed in run #591.

June 26th

June 27th

June 28th

June 29th

June 30th

July 1st

July 2nd

July 3rd

July 4th

July 5th

July 6th

July 7th