Difference between revisions of "Commissioning Shift P12"
DirkHoffmann (talk | contribs) (→June 25th) |
DirkHoffmann (talk | contribs) (→June 25th: remove erroneously deposited images) |
||
Line 27: | Line 27: | ||
Investigations on [[LidarEvents|LIDAR events]] observed in run #591. | Investigations on [[LidarEvents|LIDAR events]] observed in run #591. | ||
− | |||
− | |||
− | |||
− | |||
= June 26th = | = June 26th = |
Revision as of 22:46, 25 June 2019
Contents
P12 (21.6.2019 - 8.7.2019)
- Commissioning Shift Period: 12
- Dates: 24.5.2019 - 10.6.2019
- Commissioning Shift Leader: Dirk Hoffmann
- Commissioning Shifters / Experts:
- Drive: Thierry Le Flour, Ino Monteiro
- Camera: Takayuki Saito, Shunsuke Saturai, Yokiho Kobayashi
- AMC / Mirrors: Koji Noda (until 21.6.)
Other:
Summary Tests and Installations
E-log starting on June 23rd is here.
June 23rd
Taking data for camera timing calibration, using CaliBox pulses.
Pictures of sunspots and more studies taken by José Miguel and Koji Noda. My contributions.
June 24th
June 25th
Investigations on LIDAR events observed in run #591.