=== [[Commissioning_Shift_P12|P12 (21.6.2019 - 8.7.2019)]] ===
+
= [[Commissioning_Shift_P12|P12 (21.6.2019 - 8.7.2019)]] =
 +
 
 
* Commissioning Shift Period: 12
 
* Commissioning Shift Period: 12
 
* Dates: 24.5.2019 - 10.6.2019
 
* Dates: 24.5.2019 - 10.6.2019
Line 5: Line 6:
 
* Commissioning Shift Leader: Dirk Hoffmann
 
* Commissioning Shift Leader: Dirk Hoffmann
 
* Commissioning Shifters / Experts:
 
* Commissioning Shifters / Experts:
 
+
** Drive: Thierry Le Flour, Ino Monteiro (until 28.6.)
** Drive: Thierry Le Flour, Ino Monteiro
+
** Camera: Takayuki Saito (not on 27.6.), Shunsuke Saturai (until 26.6.), Yokiho Kobayashi, Mitsunari (from 27.6.)
** Camera: Takayuki Saito, Shunsuke Saturai, Yokiho Kobayashi  
 
 
** AMC / Mirrors: Koji Noda (until 21.6.)
 
** AMC / Mirrors: Koji Noda (until 21.6.)
Other:  
+
** Former CSL: José Miguel Miranda (until 25.6.)
 +
* Shifter: Noah Biederbeck (from 1.7.)
  
=== Summary Tests and Installations ===
+
= Summaries and Results of Tests and Installations =
 
E-log starting on June 23rd is [http://www.lst1.iac.es/elog/GENERAL/15 here].
 
E-log starting on June 23rd is [http://www.lst1.iac.es/elog/GENERAL/15 here].
  
== June 23rd ==
+
= Planned Actions =
 +
 
 +
== Sunday June 23rd (evening) ==
  
 
Taking data for camera timing calibration, using CaliBox pulses.
 
Taking data for camera timing calibration, using CaliBox pulses.
Line 20: Line 23:
 
Pictures of sunspots and more studies taken by José Miguel and Koji Noda. [[2019-SolsticeSunSpots|My contributions]].
 
Pictures of sunspots and more studies taken by José Miguel and Koji Noda. [[2019-SolsticeSunSpots|My contributions]].
  
== June 24th ==
+
== Monday June 24th ==
  
 +
Camera timing calibration
  
== June 25th ==
+
EVB tests
 +
 
 +
Drive tests
 +
 
 +
== Tuesday June 25th ==
  
 
Investigations on [[LidarEvents|LIDAR events]] observed in run #591.
 
Investigations on [[LidarEvents|LIDAR events]] observed in run #591.
  
== June 26th ==
+
Camera timing calibration
 +
 
 +
EVB tests
 +
 
 +
Drive tests
 +
 
 +
== Wednesday June 26th ==
 +
 
 +
Deploying new EVBv3 on *osaka*.
 +
 
 +
Drive: tracking tests continued
 +
 
 +
== Thursday June 27th ==
 +
 
 +
Power cut from 9:00 to 14:00! Computers will run on diesel.
 +
 
 +
Install EVBv3.1 on *osaka*, then on *okinawa*. Reproduce yesterday's results on both.
 +
 
 +
Training for Drive operation by "expert shifters"
 +
 
 +
== Friday June 28th ==
 +
 
 +
== Saturday June 29th ==
 +
 
 +
Week-end
 +
 
 +
== Sunday June 30th ==
  
== June 27th ==
+
== Monday July 1st ==
  
== June 28th ==
+
ITC / CamSrv installation cleanup
  
== June 29th ==
+
== Tuesday July 2nd ==
  
== June 30th ==
+
== Wednesday July 3rd ==
  
== July 1st ==
+
== Thursday July 4th ==
  
== July 2nd ==
+
== Friday July 5th ==
  
== July 3rd ==
+
Bringing new CSL up to speed
  
== July 4th ==
+
== Saturday July 6th ==
  
== July 5th ==
+
Handover/Overlap with new CSL
  
== July 6th ==
+
== Sunday July 7th ==
  
== July 7th ==
+
Overlap with new CSL

Revision as of 23:18, 26 June 2019

P12 (21.6.2019 - 8.7.2019)

  • Commissioning Shift Period: 12
  • Dates: 24.5.2019 - 10.6.2019
  • Commissioning Shift Leader: Dirk Hoffmann
  • Commissioning Shifters / Experts:
    • Drive: Thierry Le Flour, Ino Monteiro (until 28.6.)
    • Camera: Takayuki Saito (not on 27.6.), Shunsuke Saturai (until 26.6.), Yokiho Kobayashi, Mitsunari (from 27.6.)
    • AMC / Mirrors: Koji Noda (until 21.6.)
    • Former CSL: José Miguel Miranda (until 25.6.)
  • Shifter: Noah Biederbeck (from 1.7.)

Summaries and Results of Tests and Installations

E-log starting on June 23rd is here.

Planned Actions

Sunday June 23rd (evening)

Taking data for camera timing calibration, using CaliBox pulses.

Pictures of sunspots and more studies taken by José Miguel and Koji Noda. My contributions.

Monday June 24th

Camera timing calibration

EVB tests

Drive tests

Tuesday June 25th

Investigations on LIDAR events observed in run #591.

Camera timing calibration

EVB tests

Drive tests

Wednesday June 26th

Deploying new EVBv3 on *osaka*.

Drive: tracking tests continued

Thursday June 27th

Power cut from 9:00 to 14:00! Computers will run on diesel.

Install EVBv3.1 on *osaka*, then on *okinawa*. Reproduce yesterday's results on both.

Training for Drive operation by "expert shifters"

Friday June 28th

Saturday June 29th

Week-end

Sunday June 30th

Monday July 1st

ITC / CamSrv installation cleanup

Tuesday July 2nd

Wednesday July 3rd

Thursday July 4th

Friday July 5th

Bringing new CSL up to speed

Saturday July 6th

Handover/Overlap with new CSL

Sunday July 7th

Overlap with new CSL