== Monday July 8th ==
 
== Monday July 8th ==
  
* BP tests with Gustavo/Carlos?
+
* CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari)
**  test with TP and without HV where we perform the initialization, read the settings coarse and fine delay setting from the BP, using TP measure the up+down time, and repeat the cycle again, two or three times?
 
 
 
 
 
* CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari) ?
 
  
 
=== Night ===
 
=== Night ===
Line 67: Line 63:
 
== Tuesday July 9th ==
 
== Tuesday July 9th ==
  
Schneider people repair broken fans in IT container
+
Schneider people repair broken fans in IT container (canceled because of incident)
 +
 
 +
BP tests with Gustavo/Carlos
 +
* test with TP and without HV where we perform the initialization, read the settings coarse and fine delay setting from the BP, using TP measure the up+down time, and repeat the cycle again, two or three times?
  
 
== Wednesday July 10th ==
 
== Wednesday July 10th ==
  
 
9-11: Casana finishes work in CC (floor of server compartment)
 
9-11: Casana finishes work in CC (floor of server compartment)
 +
 +
=== Night ===
 +
Drive tests?
  
 
== Thursday July 11th ==
 
== Thursday July 11th ==

Revision as of 17:39, 9 July 2019

P13 (8.7.2019 - 22.7.2019)

  • Commissioning Shift Period: 13
  • Dates: 8.7.2019 - 22.7.2019
  • Commissioning Shift Leader: Moritz Hütten
  • Commissioning Shifters / Experts:
    • Drive: (shift crew)
    • Camera: Taka, Yokiho Kobayashi, Mitsunari (from 27.6.)
    • AMC / Mirrors: (shift crew)
    • Former CSL: Dirk Hoffmann (until 7.7.)
    • Others:
  • Shifter: Noah Biederbeck (until 13.7.)


Regular datataking (continued as in P12)

Taken every night, if availability of staff (at least 1 shifter + 1 camera shifter + Commissioning Leader) and meteorological conditions (Watch humidity and temperature limits of camera!) allow.

Note all runs in eLog and RunCatalog!

  • Prepare night data taking (last point), if applicable
    • Unlock telescope
    • Focus mirrors at sunset (not before!)
  • HV off, shutter closed
    • Pedestal 1kHz constant frequency (TIB-triggered): 100k events
    • Pedestal 1kHz random (DRAGON-triggered): 100k events
  • HV on (shutter still closed)
    • Pedestal 1kHz constant frequency (TIB-triggered): 100k events
    • Pedestal 1kHz random (DRAGON-triggered): 100k events
  • Switch on calibration laser, if to be used later
  • Park out telescope (earliest after sunset)
  • HV on, shutter open
  • Move to dark spot.
    • Open the shutter in park position (ZA limit 60°!), but then move to dark spot (to avoid passing cars' lights).
    • RA=211.08° / Dec=+29.52° is a good candidate for the dark spot; you may have others.
    • MAGICs Dark Patch 05 at RA=256.25° / Dec=38.33°
    • Pedestal 1kHz constant frequency (TIB-triggered): 100k events
    • Pedestal 1kHz random (DRAGON-triggered): 100k events
    • Calibration pulses (L1-triggered) 1kHz constant frequency
  • Pointing and data taking
    • Select a target (ask experts, or chose a reasonably active source)
    • Kill noisy pixels
    • Taka data for max. 1 hours
  • Dont' forget the proper shutdown sequence of all elements!

Planned actions

Monday July 8th

  • CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari)

Night

Sky data

Tuesday July 9th

Schneider people repair broken fans in IT container (canceled because of incident)

BP tests with Gustavo/Carlos

  • test with TP and without HV where we perform the initialization, read the settings coarse and fine delay setting from the BP, using TP measure the up+down time, and repeat the cycle again, two or three times?

Wednesday July 10th

9-11: Casana finishes work in CC (floor of server compartment)

Night

Drive tests?

Thursday July 11th

Javier Aragunde on site with José Ferraz company for LST-1 LPS

Tuesday July 16th

  • shutdown of energy storage container during whole day (No electricity in the telescope, Commissioning container and IT container will not be affected.)

Wednesday July 17th

  • shutdown of energy storage container during whole day (No electricity in the telescope, Commissioning container and IT container will not be affected.)