Difference between revisions of "Commissioning Shift P13"
(→Regular datataking (continued as in P12) |
|||
Line 55: | Line 55: | ||
== Monday July 8th == | == Monday July 8th == | ||
− | + | * CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari) | |
− | |||
− | |||
− | |||
− | * CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari) | ||
=== Night === | === Night === | ||
Line 67: | Line 63: | ||
== Tuesday July 9th == | == Tuesday July 9th == | ||
− | Schneider people repair broken fans in IT container | + | Schneider people repair broken fans in IT container (canceled because of incident) |
+ | |||
+ | BP tests with Gustavo/Carlos | ||
+ | * test with TP and without HV where we perform the initialization, read the settings coarse and fine delay setting from the BP, using TP measure the up+down time, and repeat the cycle again, two or three times? | ||
== Wednesday July 10th == | == Wednesday July 10th == | ||
9-11: Casana finishes work in CC (floor of server compartment) | 9-11: Casana finishes work in CC (floor of server compartment) | ||
+ | |||
+ | === Night === | ||
+ | Drive tests? | ||
== Thursday July 11th == | == Thursday July 11th == |
Revision as of 17:39, 9 July 2019
Contents
P13 (8.7.2019 - 22.7.2019)
- Commissioning Shift Period: 13
- Dates: 8.7.2019 - 22.7.2019
- Commissioning Shift Leader: Moritz Hütten
- Commissioning Shifters / Experts:
- Drive: (shift crew)
- Camera: Taka, Yokiho Kobayashi, Mitsunari (from 27.6.)
- AMC / Mirrors: (shift crew)
- Former CSL: Dirk Hoffmann (until 7.7.)
- Others:
- Shifter: Noah Biederbeck (until 13.7.)
Regular datataking (continued as in P12)
Taken every night, if availability of staff (at least 1 shifter + 1 camera shifter + Commissioning Leader) and meteorological conditions (Watch humidity and temperature limits of camera!) allow.
Note all runs in eLog and RunCatalog!
- Prepare night data taking (last point), if applicable
- Unlock telescope
- Focus mirrors at sunset (not before!)
- HV off, shutter closed
- Pedestal 1kHz constant frequency (TIB-triggered): 100k events
- Pedestal 1kHz random (DRAGON-triggered): 100k events
- HV on (shutter still closed)
- Pedestal 1kHz constant frequency (TIB-triggered): 100k events
- Pedestal 1kHz random (DRAGON-triggered): 100k events
- Switch on calibration laser, if to be used later
- Park out telescope (earliest after sunset)
- HV on, shutter open
- Move to dark spot.
- Open the shutter in park position (ZA limit 60°!), but then move to dark spot (to avoid passing cars' lights).
- RA=211.08° / Dec=+29.52° is a good candidate for the dark spot; you may have others.
- MAGICs Dark Patch 05 at RA=256.25° / Dec=38.33°
- Pedestal 1kHz constant frequency (TIB-triggered): 100k events
- Pedestal 1kHz random (DRAGON-triggered): 100k events
- Calibration pulses (L1-triggered) 1kHz constant frequency
- Pointing and data taking
- Select a target (ask experts, or chose a reasonably active source)
- Kill noisy pixels
- Taka data for max. 1 hours
- Dont' forget the proper shutdown sequence of all elements!
Planned actions
Monday July 8th
- CaCo start-up checks, CaCo recovery, CaCo - EVB - TIB comm. (Mitsunari)
Night
Sky data
Tuesday July 9th
Schneider people repair broken fans in IT container (canceled because of incident)
BP tests with Gustavo/Carlos
- test with TP and without HV where we perform the initialization, read the settings coarse and fine delay setting from the BP, using TP measure the up+down time, and repeat the cycle again, two or three times?
Wednesday July 10th
9-11: Casana finishes work in CC (floor of server compartment)
Night
Drive tests?
Thursday July 11th
Javier Aragunde on site with José Ferraz company for LST-1 LPS
Tuesday July 16th
- shutdown of energy storage container during whole day (No electricity in the telescope, Commissioning container and IT container will not be affected.)
Wednesday July 17th
- shutdown of energy storage container during whole day (No electricity in the telescope, Commissioning container and IT container will not be affected.)