Difference between revisions of "Logbook Mirror-Tests-Mirca-AugSept2017"

From my_wiki
Jump to: navigation, search
(Enter comments in reverse time order)
(Enter comments in reverse time order)
Line 6: Line 6:
  
 
|- valign="top"
 
|- valign="top"
 +
| 2017-08-07, 08 || Inada, Kuroda || Off-axis || To remove some items on the optical axis, we started off-axis measurement. ||
 +
|-
 +
| 2017-08-06 || Inada, Kuroda || On-axis || We confirmed that Mirca can reproduce previous result in the same setup. ||
 +
|-
 
| 2017-08-05 || Inada, Kuroda || First light || First, we decided the pixel/mm conversion factor. We succeeded to get a spot image. ||
 
| 2017-08-05 || Inada, Kuroda || First light || First, we decided the pixel/mm conversion factor. We succeeded to get a spot image. ||
 
|-
 
|-

Revision as of 11:31, 9 August 2017

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2017-08-07, 08 Inada, Kuroda Off-axis To remove some items on the optical axis, we started off-axis measurement.
2017-08-06 Inada, Kuroda On-axis We confirmed that Mirca can reproduce previous result in the same setup.
2017-08-05 Inada, Kuroda First light First, we decided the pixel/mm conversion factor. We succeeded to get a spot image.
from 2017-07-31 to 08-03 Inada, Kuroda setting up an environment We cleaned up the store room. After that, We covered windows with Eduardo and Javier.
2017-07-26 Inada, Kuroda Arrival in La Palma Safetly arrived in La Palma. Checked into the LST house.

Trouble Shooting

Under construction.

Tips

Under construction.