! Date !! Who did it? !! Action !! Comments !! photos | ! Date !! Who did it? !! Action !! Comments !! photos | ||
|- valign="top" | |- valign="top" | ||
+ | | 2017-1-17 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box || We got sponge from a shop and finally the Dark box is completed. We checked the light leakage from inside by eyes and found no problem || || | ||
+ | |- | ||
+ | | 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Cabling || We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. || || | ||
+ | |- | ||
+ | | 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box || We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. || || | ||
+ | |- | ||
| 2017-1-13 || Yusuke || Put the aluminum frame to a Pisa Dragon. ||We wanted to check if the positions of holes etc are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | | 2017-1-13 || Yusuke || Put the aluminum frame to a Pisa Dragon. ||We wanted to check if the positions of holes etc are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | ||
|- | |- |
Revision as of 23:14, 17 January 2017
Enter comments in reverse time order
Date | Who did it? | Action | Comments | photos | |
---|---|---|---|---|---|
2017-1-17 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We got sponge from a shop and finally the Dark box is completed. We checked the light leakage from inside by eyes and found no problem | ||
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Cabling | We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. | ||
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. | ||
2017-1-13 | Yusuke | Put the aluminum frame to a Pisa Dragon. | We wanted to check if the positions of holes etc are fine. We found no problem. | https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | |
2017-1-13 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-12 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 70% are done. We all are very happy. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | Not easy. Taka started to be frustrated :(. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Opening the 4 wooden box | We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. | https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00 | |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Orientation | We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. | ||
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Reception | We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. |