Difference between revisions of "Logbook Mirror-Tests-Mirca-NovDec2017"

From my_wiki
Jump to: navigation, search
(Enter comments in reverse time order)
(Enter comments in reverse time order)
Line 17: Line 17:
 
| 2017-11-15 || Satoshi, Taku || IF plate assembly || removed unnecessary plates from all of the 38 actuators here ||
 
| 2017-11-15 || Satoshi, Taku || IF plate assembly || removed unnecessary plates from all of the 38 actuators here ||
 
|-
 
|-
| 2017-11-14 || Satoshi, Taku || Reflectivity measurement of test mirror || picked up the test mirror exposed at Roque & measured the reflectivity ||
+
| 2017-11-14 || Satoshi, Taku || Reflectivity measurement of test mirror || picked up the test mirror exposed at Roque & measured its reflectivity ||
 
|-
 
|-
 
| 2017-11-02 || Satoshi Fukami || Arrival in La Palma || safely arrived in La Palma ||
 
| 2017-11-02 || Satoshi Fukami || Arrival in La Palma || safely arrived in La Palma ||

Revision as of 12:38, 25 November 2017

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2017-11-23 Satoshi, Taku Actuator Setup finished 4 groups (16/16 in total) finished all of the setup!
2017-11-22 Satoshi, Taku Actuator Setup finished 5 groups (12/16 in total)
2017-11-21 Satoshi, Taku Actuator Setup finished 5 groups (7/16 in total)
2017-11-20 Satoshi, Taku Actuator Setup prepared a big paper to write down actuator positions in the dish. started setups (radio frequency, group ID, packetization timeout and rotation speed & motor length of the actuators). finished 2 groups (2/16 in total)
2017-11-19 Satoshi, Taku Actuator Setup 191 sets of actuators finally arrived!
2017-11-15 Satoshi, Taku IF plate assembly removed unnecessary plates from all of the 38 actuators here
2017-11-14 Satoshi, Taku Reflectivity measurement of test mirror picked up the test mirror exposed at Roque & measured its reflectivity
2017-11-02 Satoshi Fukami Arrival in La Palma safely arrived in La Palma

Trouble Shooting

Under construction.

Tips

Under construction.