Difference between revisions of "Logbook Camera-Assembly"
(→Enter comments in reverse time order) |
(→Enter comments in reverse time order) |
||
Line 22: | Line 22: | ||
* Connectivity test (Cristobal) | * Connectivity test (Cristobal) | ||
* Thermal tests (Carlos Di & Alvaro) | * Thermal tests (Carlos Di & Alvaro) | ||
− | ** | + | ** Incremental study of the shielded room temperature |
|| [ drive] | || [ drive] | ||
|- | |- | ||
Line 29: | Line 29: | ||
|| | || | ||
|| | || | ||
− | * Connectivity test | + | * Connectivity test |
− | * | + | ** backplane network connections. |
− | * | + | ** Preliminary tests of the backplane network time calibration procedure with light. |
− | ** | + | * Thermal Test |
+ | ** chiller performance under high pressure (water flowing resistivity) | ||
|| [https://docs.google.com/document/d/1ZZAZdL9j8mwErRpvcdjEbaLhIuz_go0EndLcXp7NeRE/edit?usp=sharing drive] | || [https://docs.google.com/document/d/1ZZAZdL9j8mwErRpvcdjEbaLhIuz_go0EndLcXp7NeRE/edit?usp=sharing drive] | ||
|- | |- | ||
Line 40: | Line 41: | ||
|| | || | ||
* Connectivity test (Gustavo, Carlos De & Cristobal) | * Connectivity test (Gustavo, Carlos De & Cristobal) | ||
− | * Thermal | + | * Thermal Test |
+ | ** cooling system optimization | ||
|| [https://docs.google.com/document/d/1Z89SJUwQ7xAxNqzf6gzhjbjCU2nlKB2qABT_tvWrdzQ/edit?usp=sharing drive] | || [https://docs.google.com/document/d/1Z89SJUwQ7xAxNqzf6gzhjbjCU2nlKB2qABT_tvWrdzQ/edit?usp=sharing drive] | ||
|- | |- | ||
Line 51: | Line 53: | ||
* Thermal test (see picture) | * Thermal test (see picture) | ||
+ | ** the water distribution system | ||
+ | ** incremental power up | ||
** '''FIRST FULL CAMERA POWER-UP!!!''' | ** '''FIRST FULL CAMERA POWER-UP!!!''' | ||
Revision as of 09:21, 5 June 2018
Enter comments in reverse time order
Follow the module installation evolution in: drive
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-05-XX | [ drive] | |||
2018-06-01 | Cristobal, Leyre, Elena, Carlos D, Carlos D, Gustavo M., Alvaro, Quim |
|
[ drive] | |
2018-05-31 | Cristobal, Leyre, Elena, Carlos D, Carlos D, Gustavo M., Alvaro, Quim |
|
drive | |
2018-05-30 | Cristobal, Leyre, Elena, Carlos D, Carlos D, Gustavo M., Alvaro, Quim |
|
drive | |
2018-05-29 | Cristobal, Leyre, Elena, Carlos D, Carlos D, Gustavo M., Alvaro, Quim |
|
drive | |
2018-05-28 | Oscar, Carlos, Quim, Alvaro, Daniel, Elena, Cristobal |
|
drive | |
2018-05-25 | [ drive] | |||
2018-05-24 | Oscar |
|
drive | |
2018-05-23 | Léa, Otger, Oscar, Daniel |
10.1.4.21 Data switch 1 10.1.4.22 Data switch 2 10.1.4.23 Data switch 3 10.1.4.24 Data switch 4 10.1.4.25 Data switch 5 10.1.4.26 Data switch 6
Switch 1 : P1P1 Switch 2 : P1P2 Switch 3 : P2P1 Switch 4 : P2P2 Switch 5 : P3P1 Switch 6 : P3P2
|
drive | |
2018-05-22 | Daniele, Seiya, Quim, Elia, Lea, Elena, Leyre, Cristobal, Otger |
|
drive | |
2018-05-21 | Seiya, Quim, Oscar |
Bad modules investigation (Seiya) Bakplane calibration test:
|
drive | |
2018-05-18 | Quim, Quentin, Oscar, Daniel, Lea, Elena, Daniel M., Cristobal, Seiya, Daniele, Camilla | drive | ||
2018-05-17 |
|
|
drive | |
2018-05-16 | Léa, Quim, Elia, Quentin, Laia, Seiya, Daniele, Daniel | Module Installation progressing | drive | |
2018-05-15 | drive | |||
2018-05-14 | Daniel K., Lea J., Seiya, Elena M., Leyre N., Quim P. | Module validation | Network problems related to the network configuration (+ IFAE network problems) delay the module validation process. | drive |
2018-05-13 | Oscar |
|
|
drive |
2018-05-12 | Elena, Daniel, Seiya |
|
|
drive |
2018-05-11 | Elena, Otger, Javier, Quentin, Oscar, Laia, Elia, Daniele, Daniel, Seiya |
|
em1: inet 10.1.4.12 netmask 255.255.0.0 broadcast 10.1.255.255
|
drive |
2018-05-10 | Léa, Quim, Elia, Quentin, Seiya, Daniel, Elena, Laia |
|
|
drive |
2018-05-09 | Daniel K., Lea J., Elena M., Quim P., Oscar B., Gustavo M., Joan B., Elia D.S. |
|
All info can be found in: link
|
drive |
2018-05-08 | Oscar Blanch, Laia Cardiel |
|
|
drive |
2018-05-07 | Seiya Nozaki, Laia Cardiel, Lea Jouvin, Elena Moretti, Oscar Blanch, Quim Palacio, Laia Cardiel | Module validation before installation developed |
|
drive |
2018-05-04 | Daniel Kerszberg, Elena Moretti, Juan Boix, Oscar B,, Joaquim P., | Chiller installation, |
|
drive |
2018-05-03 | Nadia Fouque, Carlos Díaz, Miguel Polo, Antonio López, Seiya Nozaki, Oscar Blanch, Laia Cardiel, Javi Gaweda, Juan Boix, | ECC activities, Accessing camera front, Module validation before installation |
|
drive |
2018-05-02 | Oscar Blanch, Laia Cardiel, Nadia Fouque, Jean Luc Panazol, Daniel Kerszberg, |
Validation of ECC already using executable in CRIO |
|
drive |
2018-05-01 | Nadia Fouque, Jean-Luc Panazol, Oscar Blanch, Merve Colak, Daniel Kerszberg | ECC set up to have same state than in CIEMAT |
Control of the PDB with standalone labview ⇒ OK. Control of the ECC state machine with the Main ECC program ⇒ OK. Installation of the Main ECC executable into the cRIO ⇒ OK. Run Main-ECC.exe all night without problem. |
drive |
2018-04-27 | Javier G., Carlos Díaz, Miguel Polo, Laia Cardiel, Otger Ballester, Sebastian Grinspun, Oscar Blanch, Merve Colak, Daniel Kerszberg | Camera arrived at IFAE from CIEMAT | Camera was unload and introduced in the shielded room
Together with the camera, the chiller (as well as pipes) and the hydraulic system to open frontal door arrived to IFAE. Carlos Díaz and Miguel Polo open the back door of the camera. 3-Phase and 1-Phase power connected to the camera Ethernet RJ45 cable connected to main switch inside the camera long enough to be connected to a computer outside the shielded room (See Picture 4) which will be needed for ECC validation from May 1st to May 3rd. |
drive |
2018-04-25 | Javi Gaweda, Noel | Space around the Shielded Room is prepared for the camera arrival;
Wall of the shielded room open to allow to enter the camera. |
drive | |
2018-04-24 | Quim, Elena, Daniel, Quentin and Lea | Clean shielded room | drive | |
2018-04-23 | Léa, Quentin, Elena | Dark-Box external setup of 2 modules | drive | |
2018-04-20 | Dirk Hoffmann, Julien Houles, Quim | drive | ||
2018-04-19 | Dirk Hoffmann, Julien Houles, Oscar Blanch, Takayuki Saito | Received TIB (+ power cable) | drive | |
2018-04-18 | Léa, Dirk, Julien, Elena, Joan | drive | ||
2018-04-17 | Cristobal, Quim, Léa, Julien | IFAE switch replaced from Marseille's one | drive | |
2018-04-16 | Lea, Quim & Cristobal | Taka visits IFAE.
Fiber-switch connected. |
drive | |
2018-04-13 | Camilla, Lea, Quim & Oscar |
Power connection mounted and tested. Communication with 10 modules checked. |
drive | |
2018-04-12 | Camilla, Lea, Quim & Oscar | Vertical bus bar arrived |
Problem with the plugs cable from the bus bar to the back plane; Joan and Alex are building new cable (cables have been plugged manually and fixed with tape by Lea&Quim); Mezzanines attached; 3-phase power supply wired, but not yet plugged; |
drive |
2018-04-11 |
Camilla, Lea, Quim & Oscar |
The set up for 10 modules is organized; Larger switch (to allow for 10 modules); 1 3-phase power supply (2 spares) but not yet wired; | drive |