Difference between revisions of "Logbook AMCBox"

From my_wiki
Jump to: navigation, search
(Enter comments in reverse time order)
Line 6: Line 6:
  
 
|- valign="top"
 
|- valign="top"
 +
| 2018-08-04 || Christopher, Toni, Yusuke, Satoshi, Casana  || AMC box installation || We brought up all the remained boxes in front of the correct positions with a cherry picker. ||
 
|-
 
|-
 
| 2018-08-03 || Martin || IF plates assembly || 7 missing tube spacers on 4 already installed IF plates installed. Rest will be done starting Monday by Casana.||
 
| 2018-08-03 || Martin || IF plates assembly || 7 missing tube spacers on 4 already installed IF plates installed. Rest will be done starting Monday by Casana.||
 
|-
 
|-
| 2018-08-02 || Christopher, Martin, Toni, Yusuke, Satoshi, Dragados || AMC box installation || Yusuke and Satoshi finished preparation of the 16 boxes. We installed one AMC box (E, at the lowest) and bring up 6 boxes (C,7,A,F,B,D) near the correct positions inside the dish. ||  
+
| 2018-08-02 || Christopher, Martin, Toni, Yusuke, Satoshi, Dragados || AMC box installation || Yusuke and Satoshi finished preparation of the 16 boxes. We installed one AMC box (E, at the lowest) and brought up 6 boxes (C,7,A,F,B,D) near the correct positions inside the dish. ||  
 
|-
 
|-
 
| 2018-08-02 || Martin || IF plates assembly || Tube spacers for special special IF plates and for already installed IF plates assembled. All IF plates ready for installation on Monday.||  
 
| 2018-08-02 || Martin || IF plates assembly || Tube spacers for special special IF plates and for already installed IF plates assembled. All IF plates ready for installation on Monday.||  

Revision as of 23:03, 4 August 2018

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2018-08-04 Christopher, Toni, Yusuke, Satoshi, Casana AMC box installation We brought up all the remained boxes in front of the correct positions with a cherry picker.
2018-08-03 Martin IF plates assembly 7 missing tube spacers on 4 already installed IF plates installed. Rest will be done starting Monday by Casana.
2018-08-02 Christopher, Martin, Toni, Yusuke, Satoshi, Dragados AMC box installation Yusuke and Satoshi finished preparation of the 16 boxes. We installed one AMC box (E, at the lowest) and brought up 6 boxes (C,7,A,F,B,D) near the correct positions inside the dish.
2018-08-02 Martin IF plates assembly Tube spacers for special special IF plates and for already installed IF plates assembled. All IF plates ready for installation on Monday.
2018-07-31 Martin, Satoshi IF plates assembly We prepared almost all of the 10 special special IF plates (except attaching actuator caps, leveling fixed points and finishing tube spacers).

Trouble Shooting

Tips