Difference between revisions of "Logbook AMCBox"
MartinWill (talk | contribs) |
(→Enter comments in reverse time order) |
||
Line 5: | Line 5: | ||
! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ||
|- valign="top" | |- valign="top" | ||
+ | | 2018-08-08 || Satoshi, Dragados || AMC cabling || We finished internal cables of 1 group (E). We started cabling of two boxes (B,D). || | ||
+ | |- | ||
| 2018-08-07 || Martin, Casana || IF plates assembly || 1 Special Special IF was installed, more were not possible due to wind. Installation of missing tube holders finished. || | | 2018-08-07 || Martin, Casana || IF plates assembly || 1 Special Special IF was installed, more were not possible due to wind. Installation of missing tube holders finished. || | ||
|- | |- |
Revision as of 17:35, 8 August 2018
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-08-08 | Satoshi, Dragados | AMC cabling | We finished internal cables of 1 group (E). We started cabling of two boxes (B,D). | |
2018-08-07 | Martin, Casana | IF plates assembly | 1 Special Special IF was installed, more were not possible due to wind. Installation of missing tube holders finished. | |
2018-08-07 | Christopher, Satoshi, Yusuke, Dragados | AMC cabling | We started from internal cables (box - mirrors). We finished actuator cables for 1 group (E). | |
2018-08-06 | Martin, Casana | IF plates assembly | No installation of Special Special IF due to wind, installation of missing tube holders ongoing. | |
2018-08-06 | Christopher, Dragados, Casana | AMC box installation | We brought metal bars with the cherry picker and finished the installation of all the 16 boxes. | |
2018-08-04 | Christopher, Toni, Yusuke, Satoshi, Casana | AMC box installation | We brought up all the remained boxes in front of the correct positions with the cherry picker. | |
2018-08-03 | Martin | IF plates assembly | 7 missing tube spacers on 4 already installed IF plates installed. Rest will be done starting Monday by Casana. | |
2018-08-03 | Christopher, Toni, Dragados | AMC box installation | We installed 5 AMC box of the lower half (C,7,F,B,D). | |
2018-08-02 | Christopher, Martin, Toni, Yusuke, Satoshi, Dragados | AMC box installation | Yusuke and Satoshi finished preparation of the 16 boxes. We installed one AMC box (E, at the lowest) and brought up 6 boxes (C,7,A,F,B,D) near the correct positions inside the dish. | |
2018-08-02 | Martin | IF plates assembly | Tube spacers for special special IF plates and for already installed IF plates assembled. All IF plates ready for installation on Monday. | |
2018-07-31 | Martin, Satoshi | IF plates assembly | We prepared almost all of the 10 special special IF plates (except attaching actuator caps, leveling fixed points and finishing tube spacers). |