! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ||
|- valign="top" | |- valign="top" | ||
+ | |||
+ | | 2018-08-24 || Toni, Dragados || style="background: #ffcccb;" | AMC Box cabling || Today we finished also installation of the power and the fiber cables to each AMC box and between the AMC boxes. || | ||
+ | |- | ||
+ | |||
+ | | 2018-08-23 || Toni, Dragados || style="background: #ffcccb;" | AMC Box cabling || Today we finished the cabling of the last actuators and CMOS cameras to the AMC boxes (1,0). After lunch time we started to install the power and the fiber cables to each AMC box and between the AMC boxes. || | ||
+ | |- | ||
| 2018-08-22 || Toni, Yusuke, Dragados || style="background: #ffcccb;" | AMC Box cabling || We finished today internal cabling of the last 2 AMC boxes (1,0). See the first two pictures. We also broke all power cables into the structure and placed them in front of the respective AMC boxes. As an example for Dragados (Kaplan) I installed a power cable from AMC Box 5 to AMC Box 6. See the last two pictures. Unfortunately, our work was interrupted today because repairs were carried out on the concrete below the LST1 structure. || [[File:D0D04824-F020-457B-9C82-9FB4EF0B09DE.jpeg|200px|Image: 200 pixels]] || [[File:B6E1FA05-8553-4089-AD8C-E1A1AD79FB40.jpeg|200px|Image: 200 pixels]] || [[File:1E3436DA-EC9C-4CA4-9A76-E8754913895F.jpeg|200px|Image: 200 pixels]] ||[[File:D1AD4D2E-3A9D-4F6F-92B0-A7B4068BAD80.jpeg|200px|Image: 200 pixels]] || | | 2018-08-22 || Toni, Yusuke, Dragados || style="background: #ffcccb;" | AMC Box cabling || We finished today internal cabling of the last 2 AMC boxes (1,0). See the first two pictures. We also broke all power cables into the structure and placed them in front of the respective AMC boxes. As an example for Dragados (Kaplan) I installed a power cable from AMC Box 5 to AMC Box 6. See the last two pictures. Unfortunately, our work was interrupted today because repairs were carried out on the concrete below the LST1 structure. || [[File:D0D04824-F020-457B-9C82-9FB4EF0B09DE.jpeg|200px|Image: 200 pixels]] || [[File:B6E1FA05-8553-4089-AD8C-E1A1AD79FB40.jpeg|200px|Image: 200 pixels]] || [[File:1E3436DA-EC9C-4CA4-9A76-E8754913895F.jpeg|200px|Image: 200 pixels]] ||[[File:D1AD4D2E-3A9D-4F6F-92B0-A7B4068BAD80.jpeg|200px|Image: 200 pixels]] || |
Revision as of 07:26, 27 August 2018
Enter comments in reverse time order
General Remarks, Problems & Trouble Shooting
- On Saturday August 4 Casana helped with the installation of AMC boxes instead of Dragados to finish the installation on time.
- On Friday August 10 only one person was available to prepare the mirrors from 9 to 12, still it was possible to prepare 7 mirrors efficiently (only with help from Casana in carrying the mirrors out of the crates). The holder plates for one CMOS camera was missing, since the bottom of this mirror is accessible after installation the mirror was installed without CMOS camera.
- The installation of tube holders on already installed IF plates is very cumbersome. Sometimes the tube is in the way to properly install the holders with all 4 screws, and even if it is possible the access is very hard. Catwalks are of little help since they are too far away from the mirrors. For the next telescopes the special tube holders must already be installed during the IF plate assembly!