Difference between revisions of "Commissioning Shift P10"
(→Summary Tests and Installations) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Commissioning Shift Period: 10 | * Commissioning Shift Period: 10 | ||
* Dates: 24.5.2019 - 10.6.2019 | * Dates: 24.5.2019 - 10.6.2019 | ||
+ | |||
* Commissioning Shift Leader: Alicia López Oramas | * Commissioning Shift Leader: Alicia López Oramas | ||
− | Commissioning Shifters / Experts: | + | * Commissioning Shifters / Experts: |
** Drive: Alessandro Carossi | ** Drive: Alessandro Carossi | ||
Line 11: | Line 12: | ||
== Summary Tests and Installations == | == Summary Tests and Installations == | ||
+ | May 27: Cherry picker got stucked when Casana was exchaging some tubes in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber. |
Latest revision as of 13:53, 27 May 2019
P10 (24.5.2019 - 10.6.2019)[edit]
- Commissioning Shift Period: 10
- Dates: 24.5.2019 - 10.6.2019
- Commissioning Shift Leader: Alicia López Oramas
- Commissioning Shifters / Experts:
- Drive: Alessandro Carossi
- Camera: Elena Moretti (until 01.06), Seiya, Alice Donini (shifter)
- AMC / Mirrors:
Other:
Summary Tests and Installations[edit]
May 27: Cherry picker got stucked when Casana was exchaging some tubes in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.