Difference between revisions of "Commissioning Shift P16"
m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
* Commissioning Shift Leader: David Green | * Commissioning Shift Leader: David Green | ||
* Commissioning Shifters / Experts: | * Commissioning Shifters / Experts: | ||
− | ** Drive: | + | ** Drive: Paolo Calisee (19/08 - 31/08), shift crew |
− | ** Camera: | + | ** Camera: Yoshiki Ohtani (till 02/09), Elena Moretti (21/08 - 04/09) |
** AMC / Mirrors: | ** AMC / Mirrors: | ||
Line 12: | Line 12: | ||
− | Drive: | + | *Drive: |
− | Pointing: | + | *Pointing: |
− | AMC: | + | *AMC: |
− | Camera (CaCo, EvB): | + | *Camera (CaCo, EvB): |
+ | **16/08/19 - Fallout from the network restructuring continues. | ||
+ | **17/08/19 - Fallout from the network restructuring continues. Issue possibly narrowed to down to TIB. | ||
− | |||
+ | *Other: | ||
+ | **16/08/19 - Fallout from the network restructuring continues. | ||
+ | **16/08/19 - Starguider installed. Planning tests on Monday. | ||
+ | **16/08/19 - TCU testing continues. | ||
− | Problems and Visits: | + | **17/08/19 - Additional webcams installed for ALS East, ALS West, West Tower to Camera Platform, and Elevation Bolt. Still need to forward signal through IT container in order to see in CC. |
+ | |||
+ | *Problems and Visits: | ||
+ | ** August 16th, Open Day for Garafia. Done. | ||
+ | |||
+ | = Commissioning shift reports = |
Latest revision as of 13:53, 18 August 2019
P16 (16.8.2019 - 2.9.2019)[edit]
- Commissioning Shift Period: 16
- Dates: 16.8.2019 - 2.9.2019
- Commissioning Shift Leader: David Green
- Commissioning Shifters / Experts:
- Drive: Paolo Calisee (19/08 - 31/08), shift crew
- Camera: Yoshiki Ohtani (till 02/09), Elena Moretti (21/08 - 04/09)
- AMC / Mirrors:
Summary[edit]
- Drive:
- Pointing:
- AMC:
- Camera (CaCo, EvB):
- 16/08/19 - Fallout from the network restructuring continues.
- 17/08/19 - Fallout from the network restructuring continues. Issue possibly narrowed to down to TIB.
- Other:
- 16/08/19 - Fallout from the network restructuring continues.
- 16/08/19 - Starguider installed. Planning tests on Monday.
- 16/08/19 - TCU testing continues.
- 17/08/19 - Additional webcams installed for ALS East, ALS West, West Tower to Camera Platform, and Elevation Bolt. Still need to forward signal through IT container in order to see in CC.
- Problems and Visits:
- August 16th, Open Day for Garafia. Done.