Difference between revisions of "Logbook CameraCommissioning ORM Oct18"
DirkHoffmann (talk | contribs) (forgotten participant) |
DirkHoffmann (talk | contribs) (DATA5 link broken) |
||
Line 1: | Line 1: | ||
== Enter comments in reverse time order == | == Enter comments in reverse time order == | ||
+ | |||
+ | Glossary at the end! | ||
{| class="wikitable" border=1 cellpadding="5" cellspacing="0" | {| class="wikitable" border=1 cellpadding="5" cellspacing="0" | ||
Line 6: | Line 8: | ||
|- valign="top" | |- valign="top" | ||
− | | 2018- | + | | 2018-10-12 || Léa, Taka, Julien, Seiya, [[User:DirkHoffmann|Dirk]] || style="background: #FFCCCC;" | [https://portal.cta-observatory.org/WG/lst/DAQ/SitePages/RunCatalog.aspx#ORM Runs0012 sqq.] || No UCTS/TIB. || |
|- | |- | ||
− | | 2018- | + | | 2018-10-12 || [[User:DirkHoffmann|Dirk]] || style="background: #FFFFCC;" | Creation of logbook || || |
|- | |- | ||
− | | 2018- | + | | 2018-10-12 || Léa, Taka, Julien, Seiya, [[User:DirkHoffmann|Dirk]] || style="background: #FFCCCC;" | Discovered SLOW control fibre lost || Interruption between IT-Container/Driver-Container. Using UCTS section for replacement. || |
|- | |- | ||
− | | 2018- | + | | 2018-10-11 || Eric, Armand || style="background: #FFFFCC;" | Cable splicing || UCTS fibres ready and checked. || |
+ | |- | ||
+ | |||
+ | | 2018-10-11 || Léa, Taka, Julien, Seiya, [[User:DirkHoffmann|Dirk]] || style="background: #FFCCCC;" | DATA5-upstream broken || Located between DC-PP. and IC-PP. Eric is going to have a look on Friday, when working on the other (spare) fibres.|| | ||
|- | |- | ||
+ | |||
+ | |} | ||
+ | |||
+ | |||
+ | == Glossary == | ||
+ | |||
+ | * IC = IT-Container | ||
+ | * DC = Drive Container |
Revision as of 18:05, 12 October 2018
Enter comments in reverse time order
Glossary at the end!
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-10-12 | Léa, Taka, Julien, Seiya, Dirk | Runs0012 sqq. | No UCTS/TIB. | |
2018-10-12 | Dirk | Creation of logbook | ||
2018-10-12 | Léa, Taka, Julien, Seiya, Dirk | Discovered SLOW control fibre lost | Interruption between IT-Container/Driver-Container. Using UCTS section for replacement. | |
2018-10-11 | Eric, Armand | Cable splicing | UCTS fibres ready and checked. | |
2018-10-11 | Léa, Taka, Julien, Seiya, Dirk | DATA5-upstream broken | Located between DC-PP. and IC-PP. Eric is going to have a look on Friday, when working on the other (spare) fibres. |
Glossary
- IC = IT-Container
- DC = Drive Container