Line 94: | Line 94: | ||
== Manuals == | == Manuals == | ||
− | - Dragon | + | - Dragon [https://drive.google.com/open?id=0B6V4naKAxXfUdlNMUng1cHVMUWM] |
+ | |||
+ | - trigger mezzanine input/ouput channels and geometry [https://drive.google.com/open?id=0B6V4naKAxXfUeHBjQ3JOVzFlSW8] | ||
+ | |||
+ | - TIB [https://drive.google.com/open?id=0B6V4naKAxXfUVUF1Sy1ITHNoNEU] | ||
+ | |||
+ | - BP [https://drive.google.com/open?id=0B6V4naKAxXfUWVBmeE1SOXQ4dFU] | ||
== Problems and trouble shooting == | == Problems and trouble shooting == |
Revision as of 09:59, 13 February 2017
Contents
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents | |
---|---|---|---|---|---|
2017-2-10 | Luis Angel, Syeiya, Shunsuke, Taka, Yusuke | Device Setup | We put 7 modules and tried to distribute triggers. We created L1 trigger with test pulse (or lazar) from non-central module and checked if TIB receive this trigger via central BP. Unsuccessful. We sent Software trigger from TIB and checked if non-central modules can take data. Unsuccessful. 10 MHz and 1 PPS are distributed to all modules and we could data using local trigger (with external ref clock). So the problem is only trigger distribution. We wrote email to Gustavo and Daniel in the evening and Daniel suggested that BP is wrongly configured because now the camera is up-side down with respect to ICRR camera. | ||
2017-2-09 | Luis Angel, Syeiya, Shunsuke, Taka, Yusuke | Device Setup | With new BP configuration, we manage to see the 10 MHz and PPS clock with Osciloscope. However, we could not take data with external ref. clock. We wrote many emails to many people, and finally we found that we need to reset dragon after 10 MHz clock from is stabilized. Now we can take data with TIB 10 MHz clock. L1 Trigger from Dragon can be sent to TIB as well. Dragon can also take data from software trigger and random trigger from TIB. It is now also possible to send a L1 signal to TIB, and TIB delays it and send back to Dragon and take data. The best delay (signal comes at slice 20) is 3700. We found many problems such as noise from spot cooler changes the state of TIB, BP register 10 sometimes fails to be configured. Also, TIB send trigger even if Dragon is in busy state. All trouble shooting is summerized below | ||
2017-2-08 | Luis Angel, Syeiya, Shunsuke, Taka, Yusuke | Device Setup | OPCUA client from Shunsuke computer is working fine. We tried to take data with external ref. clock (for DRS) from TIB. But it didn't work. Clock is disabled at BP. L1 trigger from Dragon does not reach TIB either. We tried to contact Gustavo, but didn't manage. In the evening, Gustavo told us with email that with new firmware, register definition has changed. | ||
2017-2-07 | Luis Angel, Syeiya, Shunsuke, Taka, Yusuke | Device Setup | TIB is now installed. All clock signals are injected. Power is also OK. OPCUA connection via Luis's laptop is also fine. | ||
2017-2-07 | Shu, Seiya, Luis Angel | Change members. | Shu left, and Seiya and Luis Angel came. After Shu left, many problem started to pop up. We are sure that Shu is doing something remotely | ||
2017-2-07 | Shu, Shunsuke, Taka, Yusuke, Seiya | Device Setup | We tried to increase the laser intensity so that we can check the linearity up to 2000 p.e.. So far, we can go only up to 1200 p.e. or so. Yusuke change the bias current and electrical pulsed amplitude. However, we could not raise it much. We need to find a solution. | ||
2017-2-06 | Shu, Shunsuke, Taka, Yusuke | Device Setup | We manage to solve the filter wheel (FW) problem. After fighting with many hours with Raspberry Pi, we reached a solution. After connecting between Raspberry PI USB port and FW serial port, we monitor /dev/ttyUSB0 with "minicom" problem. And then send command to FW via ttyUSB0. First time it always fails, but second time on, it works. Then, we monitor /dev/ttyUSB1, and send command to FW via USB1. First time fails and 2nd time on works. Then, we stop monitoring ports. After that, both ports work perfectly until power of FW is off. It seems "minicom" monitoring settle the initialization problem. | ||
2017-2-03 | Shu, Shunsuke, Taka, Yusuke | Visitor | Masahiro, Daniel, Juan, Thomas and Ramon visited the clean room. We explained the setup and discussed a bit for the future plan etc. | ||
2017-2-03 | Shu, Shunsuke, Taka, Yusuke | Device Setup | We realized that we forgot to bring a computer for filter wheel. We could control the wheel with our laptop, but cannot use our laptop for ever. We need to find a solution. | ||
2017-2-02 | Shu, Shunsuke, Taka, Yusuke | Holiday | Official Holiday in Canary Island. | ||
2017-2-01 | Shu, Shunsuke, Taka, Yusuke | Analog sum propagation study | We tried to understand the correspondence between geometry of neighboring modules and L1 ASIC inputs. It was complicated but we manage to understand it by applying HV to one module and check triggers in the neighboring modules with no HV. | https://drive.google.com/open?id=0B6V4naKAxXfUaFRLbnJTZG5QUHM https://drive.google.com/open?id=0B6V4naKAxXfUeHBjQ3JOVzFlSW8 | |
2017-2-01 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put loctite to 60 PACTAs. | ||
2017-1-31 | Shu, Shunsuke, Taka, Yusuke | Cabling | We fixed the air pipe to release the hot air. We borrowed 2 more clock generators for 10 MHz and 1 PPS for TIB. They worked fine. | https://drive.google.com/open?id=0B6V4naKAxXfUdmFvS202MzgtSWM | |
2017-1-31 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put loctite to 190 PACTAs. | https://drive.google.com/open?id=0B6V4naKAxXfUeFRyN1AwYkUteTA | |
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put loctite to 130 PACTAs. | ||
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Light Uniformity Check | We checked the uniformity of the light pulse using 7 modules using self trigger using the mezzanine. | https://drive.google.com/open?id=0B6V4naKAxXfUQ2o3d0w4RGxPUjg https://drive.google.com/open?id=0B6V4naKAxXfUOUQ0aFZ4bU1KNUE | |
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Cabling | All BPs are mounted on the holder, as well as related cables (power, LAN, flat cables). | ||
2017-1-27 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 170 PACTA. | https://drive.google.com/open?id=0B6V4naKAxXfURUpCR1hPMS03Rm8 | |
2017-1-26 | Shu, Shunsuke, Taka, Yusuke | Cabling | We rotated the black box such that air pipe can reach the hall on the wall. We recieved BPs and mezzanines today. We started cabling of measurement setup. | https://drive.google.com/open?id=0B6V4naKAxXfUREJBUHFXUlJpem8 | |
2017-1-26 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 90 PACTA. We made 8 dummy LGs from complete LGs. We put epoxy adhesive and fixed the dummy LGs to alminum frame. 4 of them are produced. | https://drive.google.com/open?id=0B6V4naKAxXfUbWQ0QUpvSjJRTzA | |
2017-1-25 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 90 PACTA. We made 12 dummy LGs from complete LGs. | ||
2017-1-24 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 100 of PACTA screws. We sorted all 2000 PMTs here according to QE. | https://drive.google.com/open?id=0B6V4naKAxXfUdFVlNXd1N3Bvb3c | |
2017-1-24 | Shu, Shunsuke, Taka, Yusuke | Cabling | Taka negotiated with Juan Calvo to release the hot air in the lab. Juan refused. The hole in the wall of the lab for air release will be made next week. We borrowed a pulse generator from IAC for trigger for the laser. But we discovered that there is no lemo connector at IAC. We asked Javier for help, and he agreed to bring some from LaPalma at the end of this week. | https://drive.google.com/open?id=0B6V4naKAxXfUcHExbVlGM19zOTg | |
2017-1-23 | Shu, Shunsuke, Taka, Yusuke | Cabling | We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon was performed, finding no problem. Air pipe from the spot cooler is still an issue. | ||
2017-1-23 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs. | ||
2017-1-20 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We have built 19 PMT heads and 13 Dragon bodies so far. We cannot build more because "spacers" and SCBs are missing. | ||
2017-1-19 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Cabling | We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. | ||
2017-1-17 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem | https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c | |
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Cabling | We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. | ||
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. | ||
2017-1-13 | Yusuke | Module Assembly | We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. | https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | |
2017-1-13 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-12 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 70% are done. We all are very happy. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | Not easy. Taka started to be frustrated :(. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Opening the 4 wooden box | We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. | https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00 | |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Orientation | We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. | ||
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Reception | We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. |
Borrowed Goods
Manuals
- Dragon [1]
- trigger mezzanine input/ouput channels and geometry [2]
- TIB [3]
- BP [4]
Problems and trouble shooting
- Spot cooler creates lots of dew condensation [5]
- Configuration of register 10 of BP fails often. If 10 MHz clock is not seen, one should configure again manually this register. -> This was because of hexadecial - decimal confusion. Input card of ClusCo should be in decimal. (10 instead of A!).
- If we inject a long pulse (>500 ns) to TIB for software trigger, TIB creates two trigger pulses. This is not expected because TIB enters busy mode at the rising edge of long pulse. Luis Angel is working on this issue. [6]
- (Probably) compressor of spot cooler create a big noise (either on GND or via EM wave) which disturb the clock. If clock is missed, TIB enters the stand-by state, which is very annoying.
- 7th PMT at the central module seems to be delayed so long that it creates 2nd L1 trigger from one light pulse. Maybe L0 delay should be adjusted.
- When data taking of Dragon finishes, TIB becomes busy state. To reset it, we have to reset the TIB.