Difference between revisions of "Commissioning Shift Information"
Line 1: | Line 1: | ||
Instructions and useful links for the LST commissioning leaders | Instructions and useful links for the LST commissioning leaders | ||
+ | |||
== LST1 Commissioning Leaders == | == LST1 Commissioning Leaders == | ||
[https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | [https://docs.google.com/spreadsheets/d/1wi4CGx1Tmhloic1J_4FWs8m_PeB4wtHT6cpxU-ngVjI/edit#gid=0 Shifters 2019] | ||
+ | |||
+ | == Tentative plans 2019 == | ||
+ | * CW 12: Camera tests, mainly calibration. No optics tests planned, no drive tests planned. MPI team will come to make improvements in the mechanics | ||
+ | * CW 13: LAPP team is back, drive tests. Dirk and Julien: DAQ tests. Still unclear if the mirrors will be uncovered or not, depends how the next week goes. | ||
+ | Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container | ||
+ | |||
+ | |||
== Useful links == | == Useful links == | ||
[http://www.lst1.iac.es:8090/ elog] | [http://www.lst1.iac.es:8090/ elog] |
Revision as of 16:04, 11 March 2019
Instructions and useful links for the LST commissioning leaders
LST1 Commissioning Leaders
Tentative plans 2019
- CW 12: Camera tests, mainly calibration. No optics tests planned, no drive tests planned. MPI team will come to make improvements in the mechanics
- CW 13: LAPP team is back, drive tests. Dirk and Julien: DAQ tests. Still unclear if the mirrors will be uncovered or not, depends how the next week goes.
Toni Dettlaff will do some optics work inside the dish, also some work in the commissioning container