May 27: Cherry picker got stucked when Casana was exchaging some tube in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.
+
May 27: Cherry picker got stucked when Casana was exchaging some tubes in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.

Latest revision as of 13:53, 27 May 2019

P10 (24.5.2019 - 10.6.2019)[edit]

  • Commissioning Shift Period: 10
  • Dates: 24.5.2019 - 10.6.2019
  • Commissioning Shift Leader: Alicia López Oramas
  • Commissioning Shifters / Experts:
    • Drive: Alessandro Carossi
    • Camera: Elena Moretti (until 01.06), Seiya, Alice Donini (shifter)
    • AMC / Mirrors:

Other:

Summary Tests and Installations[edit]

May 27: Cherry picker got stucked when Casana was exchaging some tubes in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.