Difference between revisions of "Logbook IFplate-Assembly-Mirca-JanFeb2018"

From my_wiki
Jump to: navigation, search
(Enter comments in reverse time order)
(Enter comments in reverse time order)
Line 7: Line 7:
 
| 2018-01-10 || Satoshi, Tomohiro || arrival in La Palma || ||
 
| 2018-01-10 || Satoshi, Tomohiro || arrival in La Palma || ||
 
|-
 
|-
| 2018-01-11 || Martin, Satoshi, Tomohiro || preparation for IF plate assembly || We removed 351 unnecessary aluminum plates and 700 small pins to be threaded. We also confirmed how to assemble IF plates. We finished two plates. ||
+
| 2018-01-11 || Martin, Satoshi, Tomohiro || preparation for IF plate assembly || We removed 351 unnecessary aluminum plates and 700 small pins to be threaded. We also confirmed how to assemble IF plates and finished 2 plates additionally (in total 9). ||
 
|-
 
|-
 +
| 2018-01-12 || Martin, Satoshi, Tomohiro || IF plate assembly ||  We finished 11 plates (in total 20) and finished. Besides we attached tube spacers for 10 plates.||
 
|-
 
|-
 
|}
 
|}

Revision as of 16:54, 14 January 2018

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2018-01-10 Satoshi, Tomohiro arrival in La Palma
2018-01-11 Martin, Satoshi, Tomohiro preparation for IF plate assembly We removed 351 unnecessary aluminum plates and 700 small pins to be threaded. We also confirmed how to assemble IF plates and finished 2 plates additionally (in total 9).
2018-01-12 Martin, Satoshi, Tomohiro IF plate assembly We finished 11 plates (in total 20) and finished. Besides we attached tube spacers for 10 plates.

Trouble Shooting

Under construction.

Tips

Under construction.