(Enter comments in reverse time order)
Line 3: Line 3:
 
{| class="wikitable" border=1 cellpadding="5" cellspacing="0"  
 
{| class="wikitable" border=1 cellpadding="5" cellspacing="0"  
 
|- style="background:#efefef;"
 
|- style="background:#efefef;"
! Date !! Who did it? !! Action !! Comments !! photos
+
! style="width: 100px;" | Date !! style="width: 100px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! Photos
 
|- valign="top"
 
|- valign="top"
| 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far. || ||
+
| 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far. ||
 
|-
 
|-
| 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). || ||
+
| 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). ||  
 
|-
 
|-
| 2017-1-18 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. || ||
+
| 2017-1-18 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. ||  
 
|-
 
|-
| 2017-1-18 || Shu, Shunsuke, Taka, Yusuke ||Cabling  || We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. || ||
+
| 2017-1-18 || Shu, Shunsuke, Taka, Yusuke || Cabling  || We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. ||  
 
|-
 
|-
| 2017-1-17 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box || We got sponge from a shop and finally '''the dark box is completed!'''. We checked the light leakage from inside by eyes and found no problem ||https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c ||
+
| 2017-1-17 || Shu, Shunsuke, Taka, Yusuke || Construct Dark Box || We got sponge from a shop and finally '''the dark box is completed!'''. We checked the light leakage from inside by eyes and found no problem ||https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c
 
|-
 
|-
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Cabling || We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. || ||
+
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke || Cabling || We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. ||  
 
|-
 
|-
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box || We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. || ||
+
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke || Construct Dark Box || We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. ||  
 
|-
 
|-
| 2017-1-13 || Yusuke || Module Assembly ||We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
+
| 2017-1-13 || Yusuke || Module Assembly || We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
 
|-
 
|-
 
| 2017-1-13 || Shu, Shunsuke, Taka, Yusuke || Construct Dark Box || 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done.|| https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
 
| 2017-1-13 || Shu, Shunsuke, Taka, Yusuke || Construct Dark Box || 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done.|| https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
Line 29: Line 29:
 
| 2017-1-11 || Shu, Shunsuke, Taka, Yusuke || Opening the 4 wooden box || We opened the wooden boxes with electric screw driver etc. Everything inside looked fine.|| https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00
 
| 2017-1-11 || Shu, Shunsuke, Taka, Yusuke || Opening the 4 wooden box || We opened the wooden boxes with electric screw driver etc. Everything inside looked fine.|| https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00
 
|-
 
|-
| 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Orientation || We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well.||
+
| 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Orientation || We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. ||
 
|-
 
|-
| 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Reception || We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas.||
+
| 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Reception || We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. ||

Revision as of 17:11, 23 January 2017

Enter comments in reverse time order

Date Who did it? Action Comments Photos
2017-1-20 Shu, Shunsuke, Taka, Yusuke Module Assembly We have built 19 PMT heads and 13 Dragon bodies so far.
2017-1-19 Shu, Shunsuke, Taka, Yusuke Module Assembly We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame).
2017-1-18 Shu, Shunsuke, Taka, Yusuke Module Assembly Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that.
2017-1-18 Shu, Shunsuke, Taka, Yusuke Cabling We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio.
2017-1-17 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c
2017-1-16 Shu, Shunsuke, Taka, Yusuke Cabling We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors.
2017-1-16 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes.
2017-1-13 Yusuke Module Assembly We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
2017-1-13 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-12 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 70% are done. We all are very happy. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Construct Dark Box Not easy. Taka started to be frustrated :(. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Opening the 4 wooden box We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00
2017-1-10 Shu, Shunsuke, Taka, Yusuke Orientation We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well.
2017-1-10 Shu, Shunsuke, Taka, Yusuke Reception We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas.