Difference between revisions of "Logbook ModuleAssemblyAtIAC"

From my_wiki
Jump to: navigation, search
Line 6: Line 6:
  
 
|- valign="top"
 
|- valign="top"
| 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far. ||   
+
| 2017-1-21 || Shu, Shunsuke, Taka, Yusuke || Cabling || We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon is performed, finding no problem. || 
 +
|-
 +
| 2017-1-21 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs. || 
 +
|-
 +
| 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far.  We cannot build more because "spacers" and SCBs are missing. ||   
 
|-
 
|-
 
| 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). ||  
 
| 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). ||  

Revision as of 01:17, 24 January 2017

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2017-1-21 Shu, Shunsuke, Taka, Yusuke Cabling We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon is performed, finding no problem.
2017-1-21 Shu, Shunsuke, Taka, Yusuke Module Assembly We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs.
2017-1-20 Shu, Shunsuke, Taka, Yusuke Module Assembly We have built 19 PMT heads and 13 Dragon bodies so far. We cannot build more because "spacers" and SCBs are missing.
2017-1-19 Shu, Shunsuke, Taka, Yusuke Module Assembly We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame).
2017-1-18 Shu, Shunsuke, Taka, Yusuke Module Assembly Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that.
2017-1-18 Shu, Shunsuke, Taka, Yusuke Cabling We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio.
2017-1-17 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c
2017-1-16 Shu, Shunsuke, Taka, Yusuke Cabling We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors.
2017-1-16 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes.
2017-1-13 Yusuke Module Assembly We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
2017-1-13 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-12 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 70% are done. We all are very happy. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Construct Dark Box Not easy. Taka started to be frustrated :(. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Opening the 4 wooden box We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00
2017-1-10 Shu, Shunsuke, Taka, Yusuke Orientation We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well.
2017-1-10 Shu, Shunsuke, Taka, Yusuke Reception We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas.