Difference between revisions of "Logbook Camera-Assembly"
(→Enter comments in reverse time order) |
(→Enter comments in reverse time order) |
||
Line 6: | Line 6: | ||
|- valign="top" | |- valign="top" | ||
+ | |- | ||
+ | | 2018-04-25 || Javi Gaweda, Noel || Space around the Shielded Room is prepared for the camera arrival; | ||
+ | Wall of the shielded room open to allow to enter the camera. | ||
+ | || ||[https://docs.google.com/document/d/1hTbiQquP7mRYxYGIYKjWSCDparuxExETqEtNwCGZyBg drive] | ||
|- | |- | ||
| 2018-04-24 || || || ||[https://drive.google.com/open?id=1UAaivlNw52zVWj7UtbPrriSL6hzzDIbp3DS9tMza_7E drive] | | 2018-04-24 || || || ||[https://drive.google.com/open?id=1UAaivlNw52zVWj7UtbPrriSL6hzzDIbp3DS9tMza_7E drive] |
Revision as of 05:40, 28 April 2018
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-04-25 | Javi Gaweda, Noel | Space around the Shielded Room is prepared for the camera arrival;
Wall of the shielded room open to allow to enter the camera. |
drive | |
2018-04-24 | drive | |||
2018-04-23 | drive | |||
2018-04-20 | drive | |||
2018-04-19 | drive | |||
2018-04-18 | drive | |||
2018-04-17 | drive | |||
2018-04-16 | drive | |||
2018-04-13 | drive | |||
2018-04-12 | Camilla, Lea, Quim & Oscar | Vertical bus bar arrived;
Problem with the plugs cable from the bus bar to the back plane; Joan and Alex are building new cable (cables have been plugged manually and fixed with tape by Lea&Quim); Mezzanines attached; 3-phase power supply wired, but not yet plugged; |
drive | |
2018-04-11 |
Camilla, Lea, Quim & Oscar || The set up for 10 modules is organized; Larger switch (to allow for 10 modules); 1 3-phase power supply (2 spares) but not yet wired; |
drive |