Difference between revisions of "Incidents 2019"
(→Enter comments in reverse time order) |
(→Enter comments in reverse time order) |
||
Line 4: | Line 4: | ||
|- style="background:#efefef;" | |- style="background:#efefef;" | ||
! style="width: 100px;" | Date !! style="width: 200px;" | What happened? !! style="width: 150px;" | Corrective measures !! style="width: 300px;" | Comments !! style="width: 400px;" | Documents !! style="width: 100px;"| Incident Closed? | ! style="width: 100px;" | Date !! style="width: 200px;" | What happened? !! style="width: 150px;" | Corrective measures !! style="width: 300px;" | Comments !! style="width: 400px;" | Documents !! style="width: 100px;"| Incident Closed? | ||
+ | |||
+ | |- valign="top" | ||
+ | | 2019-02-05 || The glue of one mirror (top actuator) was unstuck || To Change the mirror (ICRR/CIEMAT/CaSana) || Mirror was changed by CaSana on 06.02.2019 || [[File:20190205_mirror01.JPG|140px|thumb|left|]] [[File:20190205_mirror02.JPG|140px|thumb|right|]] [[File:20190205_mirror03.JPG|150px|thumb|center|]] || yes | ||
|- valign="top" | |- valign="top" |
Revision as of 12:44, 6 February 2019
Enter comments in reverse time order
Date | What happened? | Corrective measures | Comments | Documents | Incident Closed? |
---|---|---|---|---|---|
2019-02-05 | The glue of one mirror (top actuator) was unstuck | To Change the mirror (ICRR/CIEMAT/CaSana) | Mirror was changed by CaSana on 06.02.2019 | yes | |
2019-01-23 | One of the four Elevation breaks is stuck during drive tests by LAPP | To Repair (MPI/CaSana) | C-Lock Washer of the shaft fell into the disks. The break had to be removed and C-Lock Washer put back. Repaired by CaSana on 25.1.2019 | yes | |
2019-01-22 | Water in electrical boxes of the ALS | Dried boxes, called Ayumar | need to replace the boxes | no |