Difference between revisions of "Commissioning Shift P10"

From my_wiki
Jump to: navigation, search
Line 12: Line 12:
  
 
== Summary Tests and Installations ==
 
== Summary Tests and Installations ==
May27: Cherry picker got stucked when Casana was exchaging some tube in the rear of the telescope
+
May 27: Cherry picker got stucked when Casana was exchaging some tube in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.

Revision as of 12:05, 27 May 2019

P10 (24.5.2019 - 10.6.2019)

  • Commissioning Shift Period: 10
  • Dates: 24.5.2019 - 10.6.2019
  • Commissioning Shift Leader: Alicia López Oramas
  • Commissioning Shifters / Experts:
    • Drive: Alessandro Carossi
    • Camera: Elena Moretti (until 01.06), Seiya, Alice Donini (shifter)
    • AMC / Mirrors:

Other:

Summary Tests and Installations

May 27: Cherry picker got stucked when Casana was exchaging some tube in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.