Difference between revisions of "Commissioning Shift P16"
m |
|||
Line 10: | Line 10: | ||
= Summary = | = Summary = | ||
+ | |||
+ | |||
+ | Drive: | ||
+ | |||
+ | |||
+ | Pointing: | ||
+ | |||
+ | |||
+ | AMC: | ||
+ | |||
+ | |||
+ | Camera (CaCo, EvB): | ||
+ | |||
+ | |||
+ | Temperature monitor inside the sunlight protection for the wire: | ||
+ | |||
+ | |||
+ | Problems and Visits: |
Revision as of 09:39, 16 August 2019
P16 (16.8.2019 - 2.9.2019)
- Commissioning Shift Period: 16
- Dates: 16.8.2019 - 2.9.2019
- Commissioning Shift Leader: David Green
- Commissioning Shifters / Experts:
- Drive:
- Camera:
- AMC / Mirrors:
Summary
Drive:
Pointing:
AMC:
Camera (CaCo, EvB):
Temperature monitor inside the sunlight protection for the wire:
Problems and Visits: