| 2017-1-17 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box  || We got sponge from a shop and finally the Dark box is completed. We checked the light leakage from inside by eyes and found no problem || ||
 +
|-
 +
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Cabling  || We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. || ||
 +
|-
 +
| 2017-1-16 || Shu, Shunsuke, Taka, Yusuke ||Construct Dark Box  || We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. || ||
 +
|-
 
| 2017-1-13 ||  Yusuke || Put the aluminum frame to a Pisa Dragon. ||We wanted to check if the positions of holes etc are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
 
| 2017-1-13 ||  Yusuke || Put the aluminum frame to a Pisa Dragon. ||We wanted to check if the positions of holes etc are fine. We found no problem. || https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
 
|-
 
|-

Revision as of 23:14, 17 January 2017

Enter comments in reverse time order

Date Who did it? Action Comments photos
2017-1-17 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We got sponge from a shop and finally the Dark box is completed. We checked the light leakage from inside by eyes and found no problem
2017-1-16 Shu, Shunsuke, Taka, Yusuke Cabling We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors.
2017-1-16 Shu, Shunsuke, Taka, Yusuke Construct Dark Box We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes.
2017-1-13 Yusuke Put the aluminum frame to a Pisa Dragon. We wanted to check if the positions of holes etc are fine. We found no problem. https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs
2017-1-13 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-12 Shu, Shunsuke, Taka, Yusuke Construct Dark Box 70% are done. We all are very happy. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Construct Dark Box Not easy. Taka started to be frustrated :(. https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing
2017-1-11 Shu, Shunsuke, Taka, Yusuke Opening the 4 wooden box We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00
2017-1-10 Shu, Shunsuke, Taka, Yusuke Orientation We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well.
2017-1-10 Shu, Shunsuke, Taka, Yusuke Reception We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas.