Difference between revisions of "Logbook ModuleAssemblyAtIAC"
(→Enter comments in reverse time order) |
|||
Line 5: | Line 5: | ||
! Date !! Who did it? !! Action !! Comments !! photos | ! Date !! Who did it? !! Action !! Comments !! photos | ||
|- valign="top" | |- valign="top" | ||
+ | | 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Dragon frame || We build 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). || || | ||
+ | |- | ||
| 2017-1-18 || Shu, Shunsuke, Taka, Yusuke || Dragon frame || Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. || || | | 2017-1-18 || Shu, Shunsuke, Taka, Yusuke || Dragon frame || Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. || || | ||
|- | |- |
Revision as of 21:17, 19 January 2017
Enter comments in reverse time order
Date | Who did it? | Action | Comments | photos | |
---|---|---|---|---|---|
2017-1-19 | Shu, Shunsuke, Taka, Yusuke | Dragon frame | We build 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Dragon frame | Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Cabling | We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. | ||
2017-1-17 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem | https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c | |
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Cabling | We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. | ||
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. | ||
2017-1-13 | Yusuke | Dragon frame. | We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. | https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | |
2017-1-13 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-12 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 70% are done. We all are very happy. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | Not easy. Taka started to be frustrated :(. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Opening the 4 wooden box | We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. | https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00 | |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Orientation | We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. | ||
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Reception | We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. |