Line 6: | Line 6: | ||
|- valign="top" | |- valign="top" | ||
− | | 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far. || | + | | 2017-1-21 || Shu, Shunsuke, Taka, Yusuke || Cabling || We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon is performed, finding no problem. || |
+ | |- | ||
+ | | 2017-1-21 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs. || | ||
+ | |- | ||
+ | | 2017-1-20 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We have built 19 PMT heads and 13 Dragon bodies so far. We cannot build more because "spacers" and SCBs are missing. || | ||
|- | |- | ||
| 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). || | | 2017-1-19 || Shu, Shunsuke, Taka, Yusuke || Module Assembly || We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). || |
Revision as of 01:17, 24 January 2017
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2017-1-21 | Shu, Shunsuke, Taka, Yusuke | Cabling | We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon is performed, finding no problem. | |
2017-1-21 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs. | |
2017-1-20 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We have built 19 PMT heads and 13 Dragon bodies so far. We cannot build more because "spacers" and SCBs are missing. | |
2017-1-19 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). | |
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. | |
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Cabling | We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. | |
2017-1-17 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem | https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c |
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Cabling | We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. | |
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. | |
2017-1-13 | Yusuke | Module Assembly | We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. | https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs |
2017-1-13 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing |
2017-1-12 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 70% are done. We all are very happy. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | Not easy. Taka started to be frustrated :(. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Opening the 4 wooden box | We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. | https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00 |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Orientation | We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. | |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Reception | We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. |