− | || | + | || Léa, Quim, Elia, Quentin, Seiya, Daniel, Elena, Laia |
|| | || | ||
− | || | + | * Connectivity configuration |
+ | * Module installation | ||
+ | * Ethernet data cables labelling/installation | ||
+ | || | ||
+ | * Connectivity | ||
+ | ** Connection to the port p1p1 fixed (coming from switch configuration, just change the switch entry of p1p1) | ||
+ | ** Osaka port configuration: | ||
+ | *** P1p1 p1p2 | ||
+ | *** P2p1 p2p2 | ||
+ | *** P3p1 p3p2 | ||
+ | *** fdl | ||
+ | ** Optical fiber cable: | ||
+ | *** 1 to p1p2 (from 1.10.5.128 to 1.10.5.255) | ||
+ | *** 2 to p1p1 (from 1.10.5.1 to 1.10.5.127) | ||
+ | *** Copper cable (black) to p2p1 (from 1.10.6.1 to 1.10.6.127) | ||
+ | *Front side camera: | ||
+ | ** light installation (help module installation) | ||
+ | ** We installed 17 modules today, so 20 modules is in camera now. | ||
+ | ** 3 Dragons had a problem at DragonQC before installation, Seiya will check if this problem is related with the analysis or module. | ||
+ | ** Some mezzanines had a problem at mezzanine check. But we repeated the check, then sometimes it works successfully and sometimes not. | ||
+ | * Back side camera: | ||
+ | ** Backplane row/column identification | ||
+ | ** Ethernet cables being checked. One bad cables already routed have been exchanged (~30 minutes) | ||
+ | * Black box: | ||
+ | ** added the cooling through a pinguino cooler. | ||
+ | |||
|| [https://docs.google.com/document/d/1S7Jnh8Q-TKr6wzL3voV7FFoXXPKWhbY60F-0ru1ASHo/edit?usp=sharing drive] | || [https://docs.google.com/document/d/1S7Jnh8Q-TKr6wzL3voV7FFoXXPKWhbY60F-0ru1ASHo/edit?usp=sharing drive] | ||
|- | |- | ||
Line 57: | Line 82: | ||
** Validate the modules | ** Validate the modules | ||
** Change dragon IPs | ** Change dragon IPs | ||
− | ** Install safety the modules | + | ** Install safety the modules |
All info can be found in: [https://docs.google.com/spreadsheets/d/1kp7C_3XpvF3GJYcB6uWNtriVw30hg6NPLAg7C7ARqFs/edit?usp=sharing link ] | All info can be found in: [https://docs.google.com/spreadsheets/d/1kp7C_3XpvF3GJYcB6uWNtriVw30hg6NPLAg7C7ARqFs/edit?usp=sharing link ] |
Revision as of 10:11, 15 May 2018
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-05-XX | [ drive] | |||
2018-05-15 | [ drive] | |||
2018-05-14 | drive | |||
2018-05-13 | drive | |||
2018-05-11 | drive | |||
2018-05-10 | Léa, Quim, Elia, Quentin, Seiya, Daniel, Elena, Laia |
|
|
drive |
2018-05-09 | Daniel K., Lea J., Elena M., Quim P., Oscar B., Gustavo M., Joan B., Elia D.S. |
|
All info can be found in: link
|
drive |
2018-05-08 | Oscar Blanch, Laia Cardiel |
|
|
drive |
2018-05-07 | Seiya Nozaki, Laia Cardiel, Lea Jouvin, Elena Moretti, Oscar Blanch, Quim Palacio, Laia Cardiel | Module validation before installation developed |
|
drive |
2018-05-04 | Daniel Kerszberg, Elena Moretti, Juan Boix, Oscar B,, Joaquim P., | Chiller installation, |
|
drive |
2018-05-03 | Nadia Fouque, Carlos Díaz, Miguel Polo, Antonio López, Seiya Nozaki, Oscar Blanch, Laia Cardiel, Javi Gaweda, Juan Boix, | ECC activities, Accessing camera front, Module validation before installation |
|
drive |
2018-05-02 | Oscar Blanch, Laia Cardiel, Nadia Fouque, Jean Luc Panazol, Daniel Kerszberg, |
Validation of ECC already using executable in CRIO |
|
drive |
2018-05-01 | Nadia Fouque, Jean-Luc Panazol, Oscar Blanch, Merve Colak, Daniel Kerszberg | ECC set up to have same state than in CIEMAT |
Control of the PDB with standalone labview ⇒ OK. Control of the ECC state machine with the Main ECC program ⇒ OK. Installation of the Main ECC executable into the cRIO ⇒ OK. Run Main-ECC.exe all night without problem. |
drive |
2018-04-27 | Javier G., Carlos Díaz, Miguel Polo, Laia Cardiel, Otger Ballester, Sebastian Grinspun, Oscar Blanch, Merve Colak, Daniel Kerszberg | Camera arrived at IFAE from CIEMAT | Camera was unload and introduced in the shielded room
Together with the camera, the chiller (as well as pipes) and the hydraulic system to open frontal door arrived to IFAE. Carlos Díaz and Miguel Polo open the back door of the camera. 3-Phase and 1-Phase power connected to the camera Ethernet RJ45 cable connected to main switch inside the camera long enough to be connected to a computer outside the shielded room (See Picture 4) which will be needed for ECC validation from May 1st to May 3rd. |
drive |
2018-04-25 | Javi Gaweda, Noel | Space around the Shielded Room is prepared for the camera arrival;
Wall of the shielded room open to allow to enter the camera. |
drive | |
2018-04-24 | Quim, Elena, Daniel, Quentin and Lea | Clean shielded room | drive | |
2018-04-23 | Léa, Quentin, Elena | Dark-Box external setup of 2 modules | drive | |
2018-04-20 | Dirk Hoffmann, Julien Houles, Quim | drive | ||
2018-04-19 | Dirk Hoffmann, Julien Houles, Oscar Blanch, Takayuki Saito | Received TIB (+ power cable) | drive | |
2018-04-18 | Léa, Dirk, Julien, Elena, Joan | drive | ||
2018-04-17 | Cristobal, Quim, Léa, Julien | IFAE switch replaced from Marseille's one | drive | |
2018-04-16 | Lea, Quim & Cristobal | Taka visits IFAE.
Fiber-switch connected. |
drive | |
2018-04-13 | Camilla, Lea, Quim & Oscar |
Power connection mounted and tested. Communication with 10 modules checked. |
drive | |
2018-04-12 | Camilla, Lea, Quim & Oscar | Vertical bus bar arrived |
Problem with the plugs cable from the bus bar to the back plane; Joan and Alex are building new cable (cables have been plugged manually and fixed with tape by Lea&Quim); Mezzanines attached; 3-phase power supply wired, but not yet plugged; |
drive |
2018-04-11 |
Camilla, Lea, Quim & Oscar |
The set up for 10 modules is organized; Larger switch (to allow for 10 modules); 1 3-phase power supply (2 spares) but not yet wired; | drive |