Difference between revisions of "Logbook AMCBox&cables-Preparation-Mirca-July2018"
Line 8: | Line 8: | ||
| 2018-07-04 || Koji, Satoshi, Tomohiro || AMC box preparation, mirror rack selection for replacing damaged mirrors, and labeling of AMC box power cables|| Koji labeled box numbers to all of the so-called external cables (box-box power & data). Satoshi finished setting up one AMC box and made a procedure. Tomo selected the mirrors to bring up to replace possibly damaged mirrors. The AMC PC inside the second AMC box had a bad power button which is not sensitive even for strong push.It was replaced with one from a spare box.|| | | 2018-07-04 || Koji, Satoshi, Tomohiro || AMC box preparation, mirror rack selection for replacing damaged mirrors, and labeling of AMC box power cables|| Koji labeled box numbers to all of the so-called external cables (box-box power & data). Satoshi finished setting up one AMC box and made a procedure. Tomo selected the mirrors to bring up to replace possibly damaged mirrors. The AMC PC inside the second AMC box had a bad power button which is not sensitive even for strong push.It was replaced with one from a spare box.|| | ||
|- | |- | ||
− | + | |} | |
== Trouble Shooting == | == Trouble Shooting == | ||
== Tips == | == Tips == | ||
− | |||
− |
Revision as of 21:31, 4 July 2018
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents |
---|---|---|---|---|
2018-07-04 | Koji, Satoshi, Tomohiro | AMC box preparation, mirror rack selection for replacing damaged mirrors, and labeling of AMC box power cables | Koji labeled box numbers to all of the so-called external cables (box-box power & data). Satoshi finished setting up one AMC box and made a procedure. Tomo selected the mirrors to bring up to replace possibly damaged mirrors. The AMC PC inside the second AMC box had a bad power button which is not sensitive even for strong push.It was replaced with one from a spare box. |