Difference between revisions of "Logbook AMCBox"

From my_wiki
Jump to: navigation, search
Line 5: Line 5:
 
! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents
 
! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents
 
|- valign="top"
 
|- valign="top"
| 2018-08-09 || Martin, Satoshi, Casana || Mirror installation || 8 mirrors were installed, 3 in the very top and 5 on the left (view from front). ||
+
| 2018-08-09 || Martin, Satoshi, Casana || Mirror installation || 8 mirrors were installed, 3 in the very top and 5 on the left (view from front). || [[File:20180809 161453.jpg|200px|Image: 200 pixels]]
 
|-
 
|-
 
| 2018-08-08 || Martin, Casana || IF plates installation || 12 Special IF were installed. ||
 
| 2018-08-08 || Martin, Casana || IF plates installation || 12 Special IF were installed. ||

Revision as of 15:36, 9 August 2018

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2018-08-09 Martin, Satoshi, Casana Mirror installation 8 mirrors were installed, 3 in the very top and 5 on the left (view from front). Image: 200 pixels
2018-08-08 Martin, Casana IF plates installation 12 Special IF were installed.
2018-08-08 Satoshi, Dragados AMC cabling We finished internal cables of 1 group (E). We started cabling of two boxes (B,D).
2018-08-07 Martin, Casana IF plates assembly 1 Special IF was installed, more were not possible due to wind. Installation of missing tube holders finished.
2018-08-07 Christopher, Satoshi, Yusuke, Dragados AMC cabling We started from internal cables (box - mirrors). We finished actuator cables for 1 group (E).
2018-08-06 Martin, Casana IF plates assembly No installation of Special IF due to wind, installation of missing tube holders ongoing.
2018-08-06 Christopher, Dragados, Casana AMC box installation We brought metal bars with the cherry picker and finished the installation of all the 16 boxes.
2018-08-04 Christopher, Toni, Yusuke, Satoshi, Casana AMC box installation We brought up all the remained boxes in front of the correct positions with the cherry picker.
2018-08-03 Martin IF plates assembly 7 missing tube spacers on 4 already installed IF plates installed. Rest will be done starting Monday by Casana.
2018-08-03 Christopher, Toni, Dragados AMC box installation We installed 5 AMC box of the lower half (C,7,F,B,D).
2018-08-02 Christopher, Martin, Toni, Yusuke, Satoshi, Dragados AMC box installation Yusuke and Satoshi finished preparation of the 16 boxes. We installed one AMC box (E, at the lowest) and brought up 6 boxes (C,7,A,F,B,D) near the correct positions inside the dish.
2018-08-02 Martin IF plates assembly Tube spacers for Special IF plates and for already installed IF plates assembled. All IF plates ready for installation on Monday.
2018-07-31 Martin, Satoshi IF plates assembly We prepared almost all of the 10 special special IF plates (except attaching actuator caps, leveling fixed points and finishing tube spacers).