| 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Reception || We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. || | | 2017-1-10 || Shu, Shunsuke, Taka, Yusuke || Reception || We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. || | ||
|- | |- | ||
− | |||
− |
Revision as of 23:40, 31 January 2017
Enter comments in reverse time order
Date | Who did it? | Action | Comments | Documents | |
---|---|---|---|---|---|
2017-1-31 | Shu, Shunsuke, Taka, Yusuke | Cabling | We fixed the air pipe to release the hot air. | ||
2017-1-31 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put loctite to 190 PACTAs. | ||
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put loctite to 130 PACTAs. | ||
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Light Uniformity Check | We checked the uniformity of the light pulse using 7 modules using self trigger using the mezzanine. | ||
2017-1-30 | Shu, Shunsuke, Taka, Yusuke | Cabling | All BPs are mounted on the holder, as well as related cables (power, LAN, flat cables). | ||
2017-1-27 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 170 PACTA. | ||
2017-1-26 | Shu, Shunsuke, Taka, Yusuke | Cabling | We rotated the black box such that air pipe can reach the hall on the wall. We recieved BPs and mezzanines today. We started cabling of measurement setup. | https://drive.google.com/open?id=0B6V4naKAxXfUREJBUHFXUlJpem8 | |
2017-1-26 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 90 PACTA. We made 8 dummy LGs from complete LGs. We put epoxy adhesive and fixed the dummy LGs to alminum frame. 4 of them are produced. | https://drive.google.com/open?id=0B6V4naKAxXfUbWQ0QUpvSjJRTzA | |
2017-1-25 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 90 PACTA. We made 12 dummy LGs from complete LGs. | ||
2017-1-24 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We put LOCTITE to 100 of PACTA screws. We sorted all 2000 PMTs here according to QE. | https://drive.google.com/open?id=0B6V4naKAxXfUdFVlNXd1N3Bvb3c | |
2017-1-24 | Shu, Shunsuke, Taka, Yusuke | Cabling | Taka negotiated with Juan Calvo to release the hot air in the lab. Juan refused. The hole in the wall of the lab for air release will be made next week. We borrowed a pulse generator from IAC for trigger for the laser. But we discovered that there is no lemo connector at IAC. We asked Javier for help, and he agreed to bring some from LaPalma at the end of this week. | https://drive.google.com/open?id=0B6V4naKAxXfUcHExbVlGM19zOTg | |
2017-1-23 | Shu, Shunsuke, Taka, Yusuke | Cabling | We connected the 380 V from the wall to PSU and got 24 V for the first time. It is working fine. QC measurements on 1 Italian Dragon was performed, finding no problem. Air pipe from the spot cooler is still an issue. | ||
2017-1-23 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We sorted 500 PMTs according to QE. We put LOCTITE to screws between PACTA and PMTs for 100 PMTs. | ||
2017-1-20 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We have built 19 PMT heads and 13 Dragon bodies so far. We cannot build more because "spacers" and SCBs are missing. | ||
2017-1-19 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | We built 9 PMT heads (PMT + tubes + SCB) and 5 Dragon bodies (Dragon + frame). | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Module Assembly | Yusuke instructed Shu, Shunsuke and Taka how to put the aluminum frame on Dragon. Now all of us can do that. | ||
2017-1-18 | Shu, Shunsuke, Taka, Yusuke | Cabling | We managed to buy the 15m 380 V cable at Coelca suggested by Javier. The connector was mounted by Sergio. | ||
2017-1-17 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We got sponge from a shop and finally the dark box is completed!. We checked the light leakage from inside by eyes and found no problem | https://drive.google.com/open?id=0B6V4naKAxXfURG1saTU4dXB2X2c | |
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Cabling | We need 380 V input for the power supply. It can be provided by the wall of the clean room but the outlet is 15 m away. Such cable was not in IAC. We went to the electric shop El Faro, but they had only connectors. | ||
2017-1-16 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | We bought black tapes in El Faro suggested by Juan Calvo and taping at all edges are done. However, we faced a slight shortage of sponge to fill the connection gaps between two half boxes. | ||
2017-1-13 | Yusuke | Module Assembly | We checked if the positions of holes etc of Italian Dragon are fine. We found no problem. | https://drive.google.com/open?id=0B6V4naKAxXfUSjRSQ3Z5LXM0WWs | |
2017-1-13 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 90% are done. We had to stop because we ran out of black tapes. We didn't find one in the city. Mirror adjustment is also not yet done. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-12 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | 70% are done. We all are very happy. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Construct Dark Box | Not easy. Taka started to be frustrated :(. | https://drive.google.com/drive/folders/0B6V4naKAxXfUSFBORzdSN3RnOGM?usp=sharing | |
2017-1-11 | Shu, Shunsuke, Taka, Yusuke | Opening the 4 wooden box | We opened the wooden boxes with electric screw driver etc. Everything inside looked fine. | https://drive.google.com/open?id=0B3iH8cBkhpd0dWZ1NDJzWXI5Y00 | |
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Orientation | We had introduction of the institute and many important people in IAC from Ramon. We had a safety seminar as well. | ||
2017-1-10 | Shu, Shunsuke, Taka, Yusuke | Reception | We shortly met with Prof. Rafael Rebolo in his office. We also had a greatest lunch ever with Ramon, Monica and Thomas. |