Difference between revisions of "Logbook AMCBox"
TONI-D-MPP (talk | contribs) (→Enter comments in reverse time order) |
TONI-D-MPP (talk | contribs) (→Enter comments in reverse time order) |
||
Line 5: | Line 5: | ||
! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ! style="width: 100px;" | Date !! style="width: 200px;" | Who did it? !! style="width: 200px;" | Action !! style="width: 500px;" | Comments !! style="width: 200px;" | Documents | ||
|- valign="top" | |- valign="top" | ||
+ | |||
+ | | 2018-08-17 || Toni, Dragados || style="background: #ffcccb;" | AMC Box cabling || We finished today internal cabling of 2 boxes (9,8). One of the Dragados workers still has failed due to illness today. We are thus only three with me for the wiring. || | ||
+ | |- | ||
| rowspan="2" | 2018-08-16 || Toni, Casana || style="background: #add8e6;" | Replace of broken mirror -5, -5 || Broken mirror -5, -5 has been replaced with a spare mirror -5, -5. || [[File:20180814_104553.jpg|200px|Image: 200 pixels]] | | rowspan="2" | 2018-08-16 || Toni, Casana || style="background: #add8e6;" | Replace of broken mirror -5, -5 || Broken mirror -5, -5 has been replaced with a spare mirror -5, -5. || [[File:20180814_104553.jpg|200px|Image: 200 pixels]] | ||
|- | |- | ||
− | | Toni, Dragados || style="background: #ffcccb;" | AMC Box cabling || We finished internal cabling of 3 boxes (C,7,4). One of the Dragados workers has failed due to illness today. We are thus only three with me for the wiring. ||[[File:LST1_Catwalkt_001.JPG|200px|Image: 200 pixels]] | + | | Toni, Dragados || style="background: #ffcccb;" | AMC Box cabling || We finished today internal cabling of 3 boxes (C,7,4). One of the Dragados workers has failed due to illness today. We are thus only three with me for the wiring. ||[[File:LST1_Catwalkt_001.JPG|200px|Image: 200 pixels]] |
|- | |- | ||
Revision as of 02:10, 21 August 2018
Enter comments in reverse time order
General Remarks, Problems & Trouble Shooting
- On Saturday August 4 Casana helped with the installation of AMC boxes instead of Dragados to finish the installation on time.
- On Friday August 10 only one person was available to prepare the mirrors from 9 to 12, still it was possible to prepare 7 mirrors efficiently (only with help from Casana in carrying the mirrors out of the crates). The holder plates for one CMOS camera was missing, since the bottom of this mirror is accessible after installation the mirror was installed without CMOS camera.
- The installation of tube holders on already installed IF plates is very cumbersome. Sometimes the tube is in the way to properly install the holders with all 4 screws, and even if it is possible the access is very hard. Catwalks are of little help since they are too far away from the mirrors. For the next telescopes the special tube holders must already be installed during the IF plate assembly!