Incidents 2019

From my_wiki
Revision as of 12:44, 6 February 2019 by Pmarquez (talk | contribs) (Enter comments in reverse time order)
Jump to: navigation, search

Enter comments in reverse time order

Date What happened? Corrective measures Comments Documents Incident Closed?
2019-02-05 The glue of one mirror (top actuator) was unstuck To Change the mirror (ICRR/CIEMAT/CaSana) Mirror was changed by CaSana on 06.02.2019
20190205 mirror01.JPG
20190205 mirror02.JPG
20190205 mirror03.JPG
yes
2019-01-23 One of the four Elevation breaks is stuck during drive tests by LAPP To Repair (MPI/CaSana) C-Lock Washer of the shaft fell into the disks. The break had to be removed and C-Lock Washer put back. Repaired by CaSana on 25.1.2019
C-Lock Washer
Break cylinder
Break cover.jpg
yes
2019-01-22 Water in electrical boxes of the ALS Dried boxes, called Ayumar need to replace the boxes
ALS box
no