Logbook Mirror-Tests-Mirca-AugSept2017

From my_wiki
Revision as of 18:21, 1 September 2017 by Hayato (talk | contribs) (Enter comments in reverse time order)
Jump to: navigation, search

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2017-09-01 Inada, Kuroda finish We finish 1f measurement. The report is this.(written in Japanese, sorry.)
2017-08-16 Inada, Kuroda the beginning of 1f We started 1f measurement. The reference mirror is No0409.
2017-08-14 Inada, Kuroda Reconstruction We started to understand the meaning of the result.
2017-08-10 Inada, Kuroda Off-axis We conclude that off-axis measurement has no problem.
2017-08-07, 08 Inada, Kuroda Off-axis To remove some items on the optical axis, we started off-axis measurement.
2017-08-06 Inada, Kuroda On-axis We confirmed that Mirca can reproduce previous result in the same setup.
2017-08-05 Inada, Kuroda First light First, we decided the pixel/mm conversion factor. We succeeded to get a spot image.
from 2017-07-31 to 08-03 Inada, Kuroda setting up an environment We cleaned up the store room. After that, We covered windows with Eduardo and Javier.
2017-07-26 Inada, Kuroda Arrival in La Palma Safetly arrived in La Palma. Checked into the LST house.

Trouble Shooting

Under construction.

Tips

Under construction.