Logbook Camera-Assembly

From my_wiki
Revision as of 12:55, 28 April 2018 by Qpalacio (talk | contribs) (Enter comments in reverse time order)
Jump to: navigation, search

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2018-04-27 Javier G., Carlos Díaz, Miguel Polo, Laia Cardiel, Otger Ballester, Sebastian Grinspun, Oscar Blanch, Merve Colak, Daniel Kerszberg Camera arrived at IFAE from CIEMAT

Camera was unload and introduced in the shielded room Together with the camera, the chiller (as well as pipes) and the hydraulic system to open frontal door arrived to IFAE. Carlos Díaz and Miguel Polo open the back door of the camera. 3-Phase and 1-Phase power connected to the camera Ethernet RJ45 cable connected to main switch inside the camera long enough to be connected to a computer outside the shielded room (See Picture 4) which will be needed for ECC validation from May 1st to May 3rd.

drive
2018-04-25 Javi Gaweda, Noel Space around the Shielded Room is prepared for the camera arrival;

Wall of the shielded room open to allow to enter the camera.

drive
2018-04-24 Quim, Elena, Daniel, Quentin and Lea Clean shielded room drive
2018-04-23 Léa, Quentin, Elena Dark-Box external setup of 2 modules drive
2018-04-20 Dirk Hoffmann, Julien Houles, Quim drive
2018-04-19 Dirk Hoffmann, Julien Houles, Oscar Blanch, Takayuki Saito Received TIB (+ power cable) drive
2018-04-18 Léa, Dirk, Julien, Elena, Joan drive
2018-04-17 Cristobal, Quim, Léa, Julien IFAE switch replaced from Marseille's one drive
2018-04-16 Lea, Quim & Cristobal Taka visits IFAE.

Fiber-switch connected.

drive
2018-04-13 Camilla, Lea, Quim & Oscar

Power connection mounted and tested. Communication with 10 modules checked.

drive
2018-04-12 Camilla, Lea, Quim & Oscar Vertical bus bar arrived;

Problem with the plugs cable from the bus bar to the back plane; Joan and Alex are building new cable (cables have been plugged manually and fixed with tape by Lea&Quim); Mezzanines attached; 3-phase power supply wired, but not yet plugged;

drive
2018-04-11

Camilla, Lea, Quim & Oscar

The set up for 10 modules is organized; Larger switch (to allow for 10 modules); 1 3-phase power supply (2 spares) but not yet wired; drive