Date |
What happened? |
Corrective measures |
Comments |
Documents |
Incident Closed?
|
2019-02-20 |
UPS from IT container stopped |
To reset the fuse TOP UPS. To change one intelligence module |
3 alarms were received from UPS when the main fuse was resetted. Alarms were sent to Schneider and one Intelligent Module needs to be changed by Schneider. UPS is working with the Redundant Intelligence Module |
|
no
|
2019-02-16 |
Power cut into Commissioning Container after bad weather. The problem was in line X1.6 |
To check/find the problem |
UPS´S were started one per one on 18.02.2019 |
|
yes
|
2019-02-05 |
The glue of one mirror (position: -8, -6; fixed point) got loose |
To Change the mirror (ICRR/CIEMAT/CaSana) |
Mirror was changed by CaSana on 06.02.2019 |
|
yes
|
2019-01-23 |
One of the four Elevation breaks is stuck during drive tests by LAPP |
To Repair (MPI/CaSana) |
C-Lock Washer of the shaft fell into the disks. The break had to be removed and C-Lock Washer put back. Repaired by CaSana on 25.1.2019 |
|
yes
|
2019-01-22 |
Water in electrical boxes of the ALS |
Dried boxes, called Ayumar |
Need to replace the boxes. Plastic boxes of IP66 were installed by Ayumar on 21.02.2019. Electronic pieces have not been changed |
|
yes
|