Logbook Mirror-Tests-Mirca-NovDec2017

From my_wiki
Revision as of 12:38, 25 November 2017 by Satoshifukami (talk | contribs) (Enter comments in reverse time order)
Jump to: navigation, search

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2017-11-23 Satoshi, Taku Actuator Setup finished 4 groups (16/16 in total) finished all of the setup!
2017-11-22 Satoshi, Taku Actuator Setup finished 5 groups (12/16 in total)
2017-11-21 Satoshi, Taku Actuator Setup finished 5 groups (7/16 in total)
2017-11-20 Satoshi, Taku Actuator Setup prepared a big paper to write down actuator positions in the dish. started setups (radio frequency, group ID, packetization timeout and rotation speed & motor length of the actuators). finished 2 groups (2/16 in total)
2017-11-19 Satoshi, Taku Actuator Setup 191 sets of actuators finally arrived!
2017-11-15 Satoshi, Taku IF plate assembly removed unnecessary plates from all of the 38 actuators here
2017-11-14 Satoshi, Taku Reflectivity measurement of test mirror picked up the test mirror exposed at Roque & measured its reflectivity
2017-11-02 Satoshi Fukami Arrival in La Palma safely arrived in La Palma

Trouble Shooting

Under construction.

Tips

Under construction.