Cycle I
This wiki-page contains the reports produced by the LST-1 Physics and Publication Board (LPPB) for each proposal submitted for the observing Cycle 1 (2023-2024). Evaluation meeting has been hold remotely on 2023, March 3 and 2023, March 9.
The LPPB includes, for this cycle, the following members:
D. Mazin (LST Project Manager),
M. Teshima (Principle Investigator),
J. Cortina (Co Principal Investigator),
A. Berti,
A. Moralejo,
D. Kerzberg,
J. Sitarek,
A. Katsuaki,
D. Green (PHYS Coordinator),
A. Carosi (Deputy PHYS Coordinator)
and Coordinators of the LST-1 Physics Working Group:
A. Fiasson, A. Donini, D. Sanchez, M.N. Rosillas, T. Terzic, S. Caroff, R. Lopez-Coto, P.Bordas, K. Noda
Editors of this page: D. Green (LST-1 PHYS Coordinator), A. Carosi (LST-1 Deputy PHYS Coordinator)
Introduction
The cycle will officially cover the time period from 2023 April XX to 2024 April XX and will account for approximately 500 hours of observation time. The 500 hours is determined from the average number of dark hours in a cycle (roughly 1000 hours) subtracted from the 500 hours of time given to MAGIC for joint observations. Since several of the proposals have MAGIC equivalent proposals (such as Target of Opportunity observations on AGN with LST-1), the ownership and actual non-overlapping observation time is difficult to determine. In such cases, negotiations between MAGIC and LST will take place to determine ownership of data and therefore which proposal the time should be subtracted from.
This first observation cycle will see the overlap of regular data taking with commissioning tasks that will in any case take priority over scientific operations. Despite the fact that some of the proposed sources will be observed in parallel with MAGIC, the scientific goal of the proposals should be achievable using only LST data. A total amount of 15 proposals were submitted divided between the different working groups as follow: 7 EGAL, 5 GAL and 3 TRANS. Due to the time limitations, represents an oversubscription of ~2.0. The full list of proposals is as follow:
Proposal Name | PI | WG | MAGIC |
---|---|---|---|
Gamma-ray Burst Observations | A. Donini | TRAN | Y (TRAN04) |
Target of Opportunity observations of Galactic Transient sources | A. Lòpez-Oramas | TRAN | Y (GAL08) |
Target of Opportunity observations on AGN with LST-1 | D. Sanchez | EGAL | N |
Search for Very High Energy pulsed emission from PSR J2021+3651 | A. Mas-Aguilar | GAL | N |
Follow-up of Gravitational wave events | M. Seglar-Arroyo | TRAN | N |
Tick-Tock: Monitoring of an inspiraling binary SMBH | J. Green | TRAN | N |
Studying the large scale, diffuse emission around the Gal Center with LST-1 | S. Abe | GAL | N |
Monitoring of low-frequency peak BL Lac (LBL) | E. Pons | EGAL | N |
Constraining short-term variability of PG 1553+113 in high emission state | E. Prandini | EGAL | N |
Newly discovered GeV-emitting SNR G17.8+16.7 | Katagiri | GAL | N |
Monitoring of misaligned AGNs | M. Nievas Rosillo | EGAL | Y (AGN04) |
Large Zenith Angle observation of the hadronic PeVatron candi- date in the Boomerang SNR (G106.3+2.7) with LST-1 | F. Cassol | GAL | Y (GAL07) |
Observations of distant bright FSRQs in active states | S. Nozaki | EGAL | N |
NGC1068 Multi-year Observations | K. Noda | EGAL | N |
AGN long-term monitoring and internal ToOs with LST1 | D. Miceli | EGAL | Y (AGN12) |
Evaluation Criteria
The LPPB produces a scientifically ranked list with scores from 1 to 10 for all the proposals that have been received.
Once the ranking has been established, the scheduling of the observations will follow a priority based on the ranked list and the available observing time, according to the following list:
- A guaranteed observation (except for major technical, commissioning, or meteorological troubles);
- B observations will be scheduled if possible (most of B observations are typically performed);
- C filling time depending on free slots;
- D no observing time has been allocated.
On top of that, all proposals have been evaluated in advance from a technical and analysis point of view by M. Will (CTA-N LST Project Manager) and A. Moralejo & R.Lopez-Coto (Software Coordinators) respectively. The 2 reports can accessed at the following links:
https://docs.google.com/document/d/1i-5lQsoVcpK6kE2tVDvwY_S7obWr8EX9uKYdhX5e-Ps/edit?usp=sharing
https://docs.google.com/document/d/1wdsJNicpyqCPoZek2jBLYgADk1QhsOYCFi1ws3af_ss/edit?usp=sharing