Logbook CameraCommissioning ORM Oct18

From my_wiki
Revision as of 10:11, 13 October 2018 by Ljouvin (talk | contribs)
Jump to: navigation, search

Enter comments in reverse time order

Glossary at the end!

Date Who did it? Action Comments Documents
2018-10-12 Léa, Taka, Julien, Seiya, Dirk Runs0012 sqq. No UCTS/TIB.
2018-10-12 Dirk Creation of logbook
2018-10-12 Léa, Taka, Julien, Seiya, Dirk Discovered SLOW control fibre lost

- Pb with slow control connection for the ECC due to a broken fibers. Fiber changed, pb resolved - In the afternoon, 3 lost of ECC slow control communication du to the interruption between IT-Container/Driver-Container. First time, temperature was already high in the camera, we had to switch ON and OFF the 233 and 400V. Two other times, we get back the ECC connection quite fact and ECC was in the same state that when the connection was lost. Just no more current in the pulse bar so we have to gotosafe and gotoready again.

- During the day, due to high temperatures we have to gotosafe to wait for the camera to cool almost 11 times but never the BP max tempeture went more than 34 degree. The air inside reach at the maximum 26.5.

- For data acquisition: - we validate for 3 fibers the new connections to the dataswitch fiber. Eric is fixing the one missing or broken. So for now only the right part of the camera is used for data acquisition - No TIB/ UCTS - few runs were taking with data aquisition with no external trigger from TIB. 3 Modules didn't appear busy but didn't sent any data. In those test the busy from the CBP is cut. Those missing modules have to be investigated in more details but due to a lot of slow control deconnection problem and hihj temperature in the camera it was not possible. - One try with no external trigger and clock but with the CBP delivering the clock and pps and using 10 MHz clock as default clock for the dragon. L1 local Trigger didn't generated. No we come back to a configuration of dragon on their local clock but this issue has to be investigated.

- Pb with the ClusCo on tcs01. The root propagation for the BPs for the trigger doesn't work. Using exactly the same script it works on CacoOperator.

Interruption . Using UCTS section for replacement. ||

2018-10-11 Eric, Armand Cable splicing UCTS fibres ready and checked.
2018-10-11 Léa, Taka, Julien, Seiya, Dirk DATA5-upstream broken Located between DC-PP. and IC-PP. Eric is going to have a look on Friday, when working on the other (spare) fibres.


Glossary

  • IC = IT-Container
  • DC = Drive Container