Commissioning Shift P3

From my_wiki
Revision as of 19:40, 25 February 2019 by MartinWill (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Commissioning Shift Period: 3
  • Dates: 17.2.2019 - 3.3.2019
  • Commissioning Shift Leader: Martin Will
  • Commissioning Shifters / Experts:
    • Drive: Inocencio (from 25/02), Thierry (from 25/02)
    • Camera: Lea (until 23/02), Shunsuke, Seiya, Tomohiko (until 02/03), Oscar (from 25/02), Gustavo (25/02 -- 01/03)
    • AMC / Mirrors: Satoshi (until 02/03), Tomohiro
    • Other: Daniel Mazin (from 1.3.)

Back to Commissioning Logbooks.

Commissioning Leader Diary[edit]

Commissioning_Leader_Diary_P3

Daily List of Tests and Installations[edit]

Date Category / System Activities Documents / Pictures
2019-02-17
Sunday
Drive
Camera
AUX
Other Day off. Check of conditions at site. P1 CL Riccardo R. arrived on site, no overlap with previous CL (since there was none).