Commissioning Shift P10
Revision as of 12:05, 27 May 2019 by Alicialopezoramas (talk | contribs)
P10 (24.5.2019 - 10.6.2019)
- Commissioning Shift Period: 10
- Dates: 24.5.2019 - 10.6.2019
- Commissioning Shift Leader: Alicia López Oramas
- Commissioning Shifters / Experts:
- Drive: Alessandro Carossi
- Camera: Elena Moretti (until 01.06), Seiya, Alice Donini (shifter)
- AMC / Mirrors:
Other:
Summary Tests and Installations
May 27: Cherry picker got stucked when Casana was exchaging some tube in the rear of the telescope. Instalation of cable inlet inside the camera house for debugging the camera using long optical fiber.