Commissioning Shift P16
P16 (16.8.2019 - 2.9.2019)
- Commissioning Shift Period: 16
- Dates: 16.8.2019 - 2.9.2019
- Commissioning Shift Leader: David Green
- Commissioning Shifters / Experts:
- Drive:
- Camera:
- AMC / Mirrors:
Summary
Drive:
Pointing:
AMC:
Camera (CaCo, EvB):
Temperature monitor inside the sunlight protection for the wire:
Problems and Visits: