Logbook AMCBox&cables-Preparation-Mirca-July2018

From my_wiki
Revision as of 18:47, 17 July 2018 by Satoshifukami (talk | contribs) (Enter comments in reverse time order)
Jump to: navigation, search

Enter comments in reverse time order

Date Who did it? Action Comments Documents
2018-07-10 Koji, Tomo, Satoshi, Dragados garbage cleaning & AMC box preparation for transportation We cleaned garbages of Shipping 5?-9 with Dragados. We fixed AMC boxes with lashing belts to palettes for transportation.
2018-07-09 Satoshi, Koji AMC box network test Test to check network and its redundancy with 6 boxes is carried out. The result was successful.
2018-07-07 Koji, Tomo, Satoshi preparation of the mirror racks for the replacement We prepared 3 racks for replacement of possibly damaged mirrors. We will send them up later.
2018-07-06 Koji, Satoshi AMC box preparation and labeling of AMC box power cables Koji finished labeling of all the actuator power sockets. Satoshi finished all the AMC boxes for LST1 except wireless modules. One of the boxes had its AMC PC power plug disconnected and two of the boxes had network switch power plug disconnected. They are maybe shaked while transportation or people who assembled the boxes just forgot to plug them.
2018-07-05 Koji, Satoshi AMC box preparation and labeling of AMC box power cables Koji sticked labels next to all the actuator power sockets on the side of 6 AMC boxes like (mirX, mirY, axis). Satoshi finished setting up 5 AMC boxes (in total 6).
2018-07-04 Koji, Satoshi, Tomohiro AMC box preparation, mirror rack selection for replacing damaged mirrors, and labeling of AMC box power cables Koji labeled box numbers to all of the so-called external cables (box-box power & data). Satoshi finished setting up one AMC box and made a procedure. Tomo selected the mirrors to bring up to replace possibly damaged mirrors. The AMC PC inside the second AMC box had a bad power button which is not sensitive even for strong push.It was replaced with one from a spare box.