Commissioning Shift P16

From my_wiki
Jump to: navigation, search

P16 (16.8.2019 - 2.9.2019)

  • Commissioning Shift Period: 16
  • Dates: 16.8.2019 - 2.9.2019
  • Commissioning Shift Leader: David Green
  • Commissioning Shifters / Experts:
    • Drive: Paolo Calisee (19/08 - 31/08), shift crew
    • Camera: Yoshiki Ohtani (till 02/09), Elena Moretti (21/08 - 04/09)
    • AMC / Mirrors:

Summary

  • Drive:


  • Pointing:


  • AMC:


  • Camera (CaCo, EvB):
    • 16/08/19 - Fallout from the network restructuring continues.
    • 17/08/19 - Fallout from the network restructuring continues. Issue possibly narrowed to down to TIB.


  • Other:
    • 16/08/19 - Fallout from the network restructuring continues.
    • 16/08/19 - Starguider installed. Planning tests on Monday.
    • 16/08/19 - TCU testing continues.
    • 17/08/19 - Additional webcams installed for ALS East, ALS West, West Tower to Camera Platform, and Elevation Bolt. Still need to forward signal through IT container in order to see in CC.
  • Problems and Visits:
    • August 16th, Open Day for Garafia. Done.

Commissioning shift reports