Special Instructions for Shifters
On this page some special instructions that go beyond the instructions in the commissioning manual can be found.
- Bending Model Data Taking (TPoints)
- Camera Startup Procedure (after power cut)
- Taking a Calibration Run using Calibration Trigger from Calibration Box
- Runs with Pulse Injection in Central Cluster at Different Rates
- Taking Linearity Runs
- L0 Rate Scans
- L1 Rate Scans on Dark Patch
- L1 Rate Scans
- TIB Firmware Update and Tests
- Procedure for manual launching of the CDTS-Server software
- Crab Data Taking (outdated)