Debugging of the tracking sequence :
- PLC sequence : trajectory tracking data correctly managed
- PLC tuning : regulation OK ==> need to refine.
- Tracking algorithm :
- Changes in Drive.ccp to allow azimuth negative values.
- Tracking duration : even by changing the duration of he tracking (from 1'to 5') ==> not correctly managed (still 1' tracking) ==> to be checked
-
|